Independent site. Data from NYC Open Data; not affiliated with the City of New York.

NYC Property Factsfree public-records reference

51 Torrice Loop, Staten Island, NY 10309

BBL 5075770074 (Borough 5, Block 7577, Lot 74) · BIN 5164343, 5170681 · Last updated:

Also recorded in city data as: 51gar Torrice Loop

Summary · as of October 31, 2026

51 Torrice Loop (Staten Island, NY 10309; tax lot BBL 5075770074) is a two-family home (building class B2: two-family home, frame (wood)), built around 2019, on a 10,211 sq ft lot zoned R3X. City tax records list the owner as HUANG, XUEFENG. The Department of Finance's final market value for tax year 2027 is $1,483,000. As of October 31, 2026, NYC Open Data shows one DOB job with a permit issued but no sign-off and five OATH tickets with an unpaid balance. There was one 311 request in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

Owner of record
HUANG, XUEFENG
Building class
B2 · Two-family home, frame
Year built · units
2019 · 2 res.
Lot area · zoning
10,211 sq ft · R3X
Market value (DOF)
$1,483,000 FY2027
Last priced deed
—
BBL
5075770074
BIN
5164343, 5170681

How to cite: NYC Property Facts, “51 Torrice Loop, Staten Island, NY 10309 (BBL 5075770074)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/staten-island/51-torrice-loop-5075770074. Source: NYC Open Data.

Lot & building

Basic facts about the tax lot and building from the city’s PLUTO database.

Owner (as listed by the city)
HUANG, XUEFENGThe owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
Building class
B2 – Two-family home, frame (wood)The Department of Finance’s category for what kind of building this is.
Land use
One- & two-family buildingsCity Planning’s broad category of how the lot is used.
Year built
2019Often an estimate for older buildings.
Floors
2
Units
2 residential / 2 totalResidential units are apartments; total includes stores and offices.
Buildings on lot
1
Lot size
10,211 sq ft (42 ft × 150 ft)
Building floor area
3,066 sq ft
Zoning
R3X, SRDThe zoning district sets what can be built and used here. Residential district.
Built vs. allowed density (FAR)
0.30 built / 0.75 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
Identifiers
BBL 5075770074 (Borough 5, Block 7577, Lot 74) · BIN 5164343, 5170681BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).

Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-01; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01

Tax assessment

How the Department of Finance values this lot for property tax.

Market value (tax year 2027, final roll)
$1,483,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
Assessed value
$88,980The portion of market value that taxes are calculated on (capped by law for small homes).
Taxable value (final)
$80,364Assessed value minus any exemptions.
Tax class
Tax class 1 – 1–3 family homes (and some small mixed-use / vacant lots)
Tax yearRollMarket valueAssessed valueTax class
2027Final$1,483,000$88,9801
2026Final$1,588,000$95,2801
2025Final$1,483,000$88,9801

Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-01

Sales & deed history 0

Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.

No records found in this dataset for this lot.

Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-01; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-01; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-01

DOB job filings 1 open of 7

A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.

StatusJob #TypeFiledEst. cost
Permitted, not signed off
PERMIT ISSUED - ENTIRE JOB/WORK · 2020-03-25
520293469
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2017-03-23$42,228
Not open
LOC Issued · 2021-09-07
S00584399-I1
DOB NOW
Alteration2021-08-27$7,224
Not open
SIGNED OFF · 2021-08-04
520373943
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2019-04-02$12,400
Not open
PLAN EXAM - DISAPPROVED · 2018-05-03
520318665
BIS
NB – New building2018-05-02—
Not open
SIGNED OFF · 2021-09-14
520291176
BIS
NB – New building2018-01-26—
Not open
SIGNED OFF · 2020-08-31
520301511
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2017-06-14$215,000
Not open
SIGNED OFF · 2025-07-03
520168014
BIS
A3 – Minor alteration (one type of work)2013-11-12—

Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-10-31; data as of 2026-11-01; DOB Job Application Filings (BIS) — city dataset updated 2026-10-30; data as of 2026-10-31

Work permits 21

Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.

IssuedExpiresJob #WorkPermit status
2023-03-162024-03-15520293469
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2022-03-122023-03-12520293469
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2021-08-312022-03-20S00584399-I1
DOB NOW
Curb Cut
34' TOTAL CURB CUT. CURB CUT ALSO APPLIES TO ALL HOUSES IN DEVELOPMENT (39, 37, 35, 33, 31, 29, 27, 25, 23, 21, 19, 17, 15, 12, 42, 41, 43, 45, 44, 10, 11, 9,
Signed-off
2021-06-032022-06-03520291176
BIS
Plumbing / PlumbingISSUED (renewal)
2021-03-242022-03-24520293469
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2021-03-232022-03-20520291176
BIS
New buildingISSUED (renewal)
2020-03-252021-03-25520293469
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2020-03-242021-03-20520291176
BIS
New buildingISSUED (renewal)
2019-06-282020-12-31520373943
BIS
Plumbing / PlumbingISSUED (initial)
2019-06-282020-12-31520291176
BIS
Plumbing / PlumbingISSUED (initial)
2019-06-282020-12-31520373943
BIS
Equipment work / SprinklerISSUED (initial)
2019-03-192020-09-30520301511
BIS
Equipment work / Other / general constructionISSUED (renewal)

Showing 12 of 21 records. The API and the source dataset have the full list.

Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-10-31; data as of 2026-11-01; DOB Permit Issuance (BIS) — city dataset updated 2026-10-31; data as of 2026-10-31

DOB violations 0 active of 2

Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).

StatusIssuedTypeDescriptionNumber
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2018-10-05C-CONSTRUCTION OTHER OPTIONALV*100518CE030KA
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2018-10-05C-CONSTRUCTION OTHER OPTIONALV*100518CE031KA

Source: DOB Violations — city dataset updated 2026-10-31; data as of 2026-11-01

ECB violations (DOB) 0 active of 11

DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.

StatusIssuedSeverityWhat it was forPenalty / paid / balanceECB #
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2017-10-30CLASS - 2BC3307.7 FAILURE TO PROVIDE AN ADEQUATE CONSTRUCTION FENCE.INADEQUACIES NOTED:AT TIME OF INSPECTION,THE CONTRACTOR INSTALLED A LTI INIE FENCE MADE OF CHAIN LINK WRAPPED W/GREEN MESH NETTING.THE CODE REQUIRES A$0 / $0 / $035288090X
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2017-10-30CLASS - 2WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS AND/OR APPROVE AMENDMENTS.AT THE TIME OF INSPECTION,THE CONTRACTOR PERFORMED EXCAVATIONWORK AT EXP#3&4, AND PROCEEDED TO INSTALL PILES AT EXP#3 THAT WAS NOT A$0 / $0 / $035288081Y
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2017-10-30CLASS - 1FAILURE TO NOTIFY DOB W/IN 24-48 HRS OF THE START OF EXCAVATION.AT TIME OF INSPECTION THE CONTRACTOR EXCAVATED THEIR PROPERTY W/O FIRST NOTIFYING DOB W/IN THE ALLOTTED TIME OR DID NOT NOTIFY PRIOR TO THEIR EXCA$1,200 / $1,204 / $035288087P
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2017-11-01CLASS - 1TAMPERED W/REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER.AT TIME OF INSPECTION THE CONTRACTOR REMOVED SWO DOCUMENT THAT WAS POSTED ON THE EXP#1 CONSTRUCTIONFENCE TO THE RIGHT OF THE MAILBOX.SWO WAS POSTED$1,000 / $1,003 / $035288092J
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2017-10-30CLASS - 2BC1704.1.1:FAILURE TO FILE A SPECIAL INSPECITON STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUANCE AND PRIOR TO START OF WORK UNDER SPECIAL INSPECTION REQUIREMENT.AT TIME OF INSPECTION THE OWNER DID NOT PROPE$0 / $0 / $035288091H
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2017-10-30CLASS - 2CONSTRUCTION SUPER FAILED TO PERFORM DUTIES AS PER RULE.AT TIME OF INSPECTION THE CONSTRUCTION SUPER SAM CRISPI WAS NOT ONSITE,NOR WAS THERE ANY INDICATION HE WAS EVER THERE.NO OFFICIAL DESIGNATED COMPETENT PER$2,500 / $2,500 / $035288080M
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2021-07-20CLASS - 2CONSTRUCTION FENCE NOT MAINTAINED.AT TIME OF INSPECTION OF 3 STORY PROPOSED NEW BUILDING WITH CONSTRUCTION FENCE IN PLACE OBSERVED ABOVE CONSTRUCTION FENCE HAS MULTIPLE OPENINGS.OUT OF PLUMB NOT SOLID,NOT FULLY$0 / $0 / $035583148L
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2017-10-30CLASS - 1FAILURE TO PROVIDE PROTECTION AT SIDE OF EXCAVATION.AT THE TIME OF INSPECTION THE CONTRACTOR EXCAVATED MORE THAN 10 FT AT EXP#3AND 4 AND THE CUT OF THE EXCAVATED WALLS(SHEER CUT)WAS W/O AN ANGLE OF REPOSE,AND T$2,400 / $2,408 / $035288088R
Resolved
Hearing: ADMIT/IN-VIO · Certification: CERTIFICATE ACCEPTED
2018-09-06CLASS - 1FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS. AT TIME OF INSPECTION, I OBSERVED ACTIVE CONSTRUCTION SITE, GC WAS AT EXCAVATION STAGE, ERECTED RETAINING WALL AT EXP #4. THE PROPERTY NEXT$5,030 / $5,030 / $035313790Z
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2017-10-30CLASS - 2CONSTRUCTION SUPER FAILS TO MAINTAIN AND/OR MAKE JOB SITE LOGS AVAILABLE.AT TIME OF INSPECTION THE REGISTERED CONSTRUCTION SUPER SAM CRISPI DID NOT HAVE DAILY JOBSITE LOG BOOKS AVAILABLE UPON REQUEST.REM:MAINTA$0 / $0 / $035288082X
Resolved
Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED
2017-10-30CLASS - 2WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS AND/OR APPROVED AMENDMENTS.AT THE TIME OF INSPECTION,THE CONTRACTOR DID NOT PERFORM SLOPING OF EXCAVATION SIDES AT EXP #3AND 4.THE DOB APPROVED PLANS CALL FOR$0 / $0 / $035288089Z

Source: DOB ECB Violations — city dataset updated 2026-10-31; data as of 2026-11-01

OATH tickets (all agencies) 5 unpaid of 10

Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.

StatusDateAgencyChargeRespondentImposed / paid / balanceTicket #
Unpaid balance Default
DOCKETED · DEFAULTED
2025-08-19Dos - Enforcement AgentsSTORAGE OF RECEPTACLES PLACED OUT PRIOR TO 6PMHUANG XUEFENG$300 / $0 / $320049373003N
Unpaid balance Default
DOCKETED · DEFAULTED
2023-10-24Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICEJOHN ROTONDO$125 / $0 / $125048165911X
Unpaid balance Default
DOCKETED · DEFAULTED
2023-10-24Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICEJOHN ROTONDO$125 / $0 / $125048165866X
Unpaid balance Default
DOCKETED · DEFAULTED
2023-10-24Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICEJOHN ROTONDO$125 / $0 / $125048165912H
Unpaid balance Default
DOCKETED · DEFAULTED
2023-10-24Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICEJOHN ROTONDO$125 / $0 / $125048165867H
No balance due
PAID IN FULL
2025-10-14Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREETHUANG XUEFENG$50 / $50 / $0048294199M
No balance due
PAID IN FULL
2025-03-22Sanitation OthersFAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITSHUANG XUEFENG$25 / $25 / $0049018424P
No balance due
APPEAL DECIS RENDERD · IN VIOLATION
2024-11-21Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICETHE COLLECTOR'S CAVE$75 / $75 / $0048436830X
No balance due
APPEAL DECIS RENDERD · IN VIOLATION
2024-11-21Dos - Enforcement AgentsILLEGAL POSTING OF HANDBILL NOTICETHE COLLECTOR'S CAVE$75 / $75 / $0048436829Z
No balance due
HEARING COMPLETED · IN VIOLATION
2021-07-20Dept. Of BuildingsJOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SECTIONM.S.B. DEVELOPMENT CO INC$0 / $0 / $0035583148L

Source: OATH Hearings Division Case Status — city dataset updated 2026-11-01; data as of 2026-11-01

HPD registration & contacts

Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.

No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).

Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-10-28; data as of 2026-11-01; HPD Registration Contacts — city dataset updated 2026-10-28; data as of 2026-11-01

HPD housing-code violations 0 open of 0

Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-10-31; data as of 2026-11-01

HPD complaints 0

Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-01; data as of 2026-11-01

311 requests (last 12 months) 1

Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.

OpenedAgencyComplaintStatusClosed
2026-01-05DOTStreet Condition – Rough, Pitted or Cracked RoadsClosed2026-01-05

Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-01; data as of 2026-11-01

Nearby properties

On Torrice Loop

Same tax block (7577)

All properties on Torrice Loop, Staten Island · All of Staten Island 10309 (Annadale-Huguenot-Prince's Bay-Woodrow)

Open-item counts as of October 31, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs