Independent site. Data from NYC Open Data; not affiliated with the City of New York.

NYC Property Factsfree public-records reference

62 3rd Avenue, Manhattan, NY 10003

BBL 1005560021 (Borough 1, Block 556, Lot 21) · BIN 1008970 · Last updated:

Summary · as of November 6, 2026

62 3rd Avenue (Manhattan, NY 10003; tax lot BBL 1005560021) is a vacant lot (building class V1: vacant land zoned commercial), on a 1,852 sq ft lot zoned C6-2A. City tax records list the owner as 62-64 THIRD AVE L.P.; per ACRIS, a deed to this owner dated July 27, 2018 lists a price of $6,880,000. The Department of Finance's final market value for tax year 2027 is $251,000. As of November 6, 2026, NYC Open Data shows one DOB job with a permit issued but no sign-off and one OATH ticket with an unpaid balance. There was one 311 request in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

Owner of record
62-64 THIRD AVE L.P.
Building class
V1 · Vacant land zoned commercial
Year built · units
— · 0 res.
Lot area · zoning
1,852 sq ft · C6-2A
Market value (DOF)
$251,000 FY2027
Last priced deed
$6,880,000 · 2018-07-27
BBL
1005560021
BIN
1008970

How to cite: NYC Property Facts, “62 3rd Avenue, Manhattan, NY 10003 (BBL 1005560021)”, data as of 2026-11-06, https://nycpropertyfacts.com/ny/manhattan/62-3rd-avenue-1005560021. Source: NYC Open Data.

Lot & building

Basic facts about the tax lot and building from the city’s PLUTO database.

Owner (as listed by the city)
62-64 THIRD AVE L.P.The owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
Building class
V1 – Vacant land zoned commercialThe Department of Finance’s category for what kind of building this is.
Land use
Vacant landCity Planning’s broad category of how the lot is used.
Year built
—Often an estimate for older buildings. Major alteration recorded: 1980.
Floors
—
Units
0 residential / 0 totalResidential units are apartments; total includes stores and offices.
Buildings on lot
0
Lot size
1,852 sq ft (23.75 ft × 77.83 ft)
Building floor area
0 sq ft
Zoning
C6-2AThe zoning district sets what can be built and used here. Commercial district.
Built vs. allowed density (FAR)
0.00 built / 6.02 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
Identifiers
BBL 1005560021 (Borough 1, Block 556, Lot 21) · BIN 1008970BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).

Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-07; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01

Tax assessment

How the Department of Finance values this lot for property tax.

Market value (tax year 2027, final roll)
$251,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
Assessed value
$112,950The portion of market value that taxes are calculated on (capped by law for small homes).
Taxable value (final)
$92,070Assessed value minus any exemptions.
Tax class
Tax class 4 – commercial / industrial
Tax yearRollMarket valueAssessed valueTax class
2027Final$251,000$112,9504
2026Final$193,000$86,8504
2025Final$1,464,000$658,8004

Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-07

Sales & deed history 2

Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.

DateTypePriceSeller (grantor)Buyer (grantee)Doc ID
2018-07-27DEED$6,880,00062 Third Avenue Associates Llc62-64 Third Ave L.P.2018073100075001
2016-10-26DEED$9,300,00062 Third Ave. Inc.,62 Third Avenue Associates, Llc2016110301405001

Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-07; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-07; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-07

DOB job filings 1 open of 12

A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.

StatusJob #TypeFiledEst. cost
Permitted, not signed off
PERMIT ISSUED - ENTIRE JOB/WORK · 2018-04-26
140622654
BIS
A3 – Minor alteration (one type of work)2017-03-28—
Not open
LOC Issued · 2025-03-18
M00936753-I1
DOB NOW
Alteration2025-01-08$10,000
Not open
Full Demolition Signed-off · 2025-01-31
M00913243-P1
DOB NOW
Full Demolition2024-08-19$75,000
Not open
Approved · 2024-01-26
M00958369-P1
DOB NOW
Alteration2024-01-26$10,000
Not open
LOC Issued · 2025-10-09
M00958369-I1
DOB NOW
Alteration2023-11-21$10,000
Not open
Full Demolition Signed-off · 2025-01-31
M00913243-S1
DOB NOW
Full Demolition2023-11-10$160
Not open
LOC Issued · 2026-09-30
M00945596-I1
DOB NOW
Alteration2023-10-16$160
Not open
LOC Issued · 2025-03-11
M00913470-S1
DOB NOW
Alteration2023-08-22$160
Not open
LOC Issued · 2025-03-18
M00913470-I1
DOB NOW
Alteration2023-08-15$20,000
Not open
LOC Issued · 2025-01-31
M00913243-I1
DOB NOW
Full Demolition2023-08-08$75,000
Not open
SIGNED OFF · 2006-11-22
104587859
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2006-10-19$35,000
Not open
SIGNED OFF · 2004-01-28
103583926
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2003-10-08$15,000

Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-11-06; data as of 2026-11-07; DOB Job Application Filings (BIS) — city dataset updated 2026-11-05; data as of 2026-11-06

Work permits 21

Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.

IssuedExpiresJob #WorkPermit status
2026-03-052026-07-09M00945596-I1
DOB NOW
Construction Fence
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Signed-off
2025-02-262026-02-26M00945596-I1
DOB NOW
Construction Fence
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Signed-off
2025-01-172025-08-22M00936753-I1
DOB NOW
Sprinklers
PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB#M00913243. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Signed-off
2024-11-132025-04-26M00913243-I1
DOB NOW
Full Demolition
Full demolition to a four story building
Signed-off
2024-11-132025-04-26M00913243-S1
DOB NOW
Protection and Mechanical Methods
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AND USE OF CHUTE AT THE TIME OF DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
Signed-off
2024-10-232025-10-23M00958369-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS
Signed-off
2024-10-232025-10-23M00958369-I1
DOB NOW
Supported Scaffold
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS
Signed-off
2024-10-232025-10-23M00958369-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS
Signed-off
2024-10-232025-10-23M00958369-I1
DOB NOW
Supported Scaffold
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS
Signed-off
2024-08-232025-04-26M00913470-S1
DOB NOW
Protection and Mechanical Methods
USE OF CHUTE AT THE TIME OF INTERIOR DEMOLITION
Signed-off
2024-02-202025-02-20M00945596-I1
DOB NOW
Construction Fence
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Signed-off
2023-11-222024-11-22M00958369-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS
Signed-off

Showing 12 of 21 records. The API and the source dataset have the full list.

Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-11-06; data as of 2026-11-07; DOB Permit Issuance (BIS) — city dataset updated 2026-11-07; data as of 2026-11-07

DOB violations 0 active of 1

Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).

StatusIssuedTypeDescriptionNumber
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2003-09-27C-CONSTRUCTION OTHER OPTIONALV*092703C092703CNE1L

Source: DOB Violations — city dataset updated 2026-11-06; data as of 2026-11-07

ECB violations (DOB) 0 active of 0

DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.

No records found in this dataset for this lot.

Source: DOB ECB Violations — city dataset updated 2026-11-06; data as of 2026-11-07

OATH tickets (all agencies) 1 unpaid of 30

Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.

StatusDateAgencyChargeRespondentImposed / paid / balanceTicket #
Unpaid balance Default
DEFAULTED · DEFAULTED
2022-09-23Pcs - DohmhFAIL TO ELIMINATE RODENT INFESTATION SHOWN BY ACTIVE RODENT SIGNS 1ST62-64 THIRD AVE L P$600 / $0 / $6000802421410
No balance due
HEARING COMPLETED · DISMISSED
2023-10-23Dep - Bureau Of Env. CompliancIDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 2ND OFFALBA CARTING DEMOLITION INC$0 / $0 / $0000817567P
No balance due
PAID IN FULL · IN VIOLATION
2023-08-14Asbestos Control ProgramFAILED TO PROVIDE NEGATIVE PRESSURE VENTILATIONENVIRONMENTAL INC$1,000 / $1,000 / $0051008051Y
No balance due
PAID IN FULL · IN VIOLATION
2023-08-14Asbestos Control ProgramFAILED TO PROVIDE NEGATIVE PRESSURE VENTILATIONTHIRD AVE LP$1,000 / $1,000 / $0051008050M
No balance due
PAID IN FULL · IN VIOLATION
2023-04-01Dep - Bureau Of Env. CompliancIDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFFWADE TOURS INC$350 / $455 / $0000769280Y
No balance due
PAID IN FULL
2021-12-17Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$50 / $50 / $0047364268L
No balance due Default
PAID IN FULL · DEFAULTED
2021-06-22Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$300 / $300 / $0047130657N
No balance due
PAID IN FULL
2021-05-29Sanitation OthersDIRTY SIDEWALK DIRTY AREA62-64 THIRD AVE L P$100 / $100 / $0047194027L
No balance due
PAID IN FULL · SETTL IN-VIO
2021-04-19Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$300 / $201 / $0047105857N
No balance due
PAID IN FULL
2021-03-25Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$100 / $100 / $0046988758N
No balance due
PAID IN FULL · SETTL IN-VIO
2021-01-07Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$300 / $204 / $0046972964H
No balance due
PAID IN FULL · SETTL IN-VIO
2021-01-02Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET62-64 THIRD AVE L P$300 / $206 / $0046972941P

Showing 12 of 30 records. The API and the source dataset have the full list.

Source: OATH Hearings Division Case Status — city dataset updated 2026-11-06; data as of 2026-11-06

HPD registration & contacts

Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.

No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).

Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-11-04; data as of 2026-11-07; HPD Registration Contacts — city dataset updated 2026-11-04; data as of 2026-11-07

HPD housing-code violations 0 open of 0

Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-11-06; data as of 2026-11-07

HPD complaints 0

Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-07; data as of 2026-11-07

311 requests (last 12 months) 1

Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.

OpenedAgencyComplaintStatusClosed
2026-10-18TLCTaxi Complaint – Driver Complaint - PassengerIn Progress—

Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-07; data as of 2026-11-07

Nearby properties

More in East Village: Open HPD violations · Active DOB violations · Active ECB violations · Open DOB jobs · Unpaid OATH tickets

On 3 Ave

Same tax block (556)

All properties on 3 Ave, Manhattan · All of Manhattan 10003

Open-item counts as of November 6, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs