Independent site. Data from NYC Open Data; not affiliated with the City of New York.

NYC Property Factsfree public-records reference

47-29 98th Place, Queens, NY 11368

BBL 4018820058 (Borough 4, Block 1882, Lot 58) · BIN 4559581, 4046565 · Last updated:

Summary · as of November 5, 2026

47-29 98th Place (Queens, NY 11368; tax lot BBL 4018820058) is a two-family home (building class B3: two-family home converted from one-family), built around 1920, on a 2,219 sq ft lot zoned R5. City tax records list the owner as WANG, LI ZHU; per ACRIS, a deed to this owner dated April 8, 2010 lists a price of $320,000. The Department of Finance's final market value for tax year 2027 is $912,000. As of November 5, 2026, NYC Open Data shows no open DOB jobs, active DOB/ECB violations, open HPD violations or unpaid OATH tickets for this lot. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

Owner of record
WANG, LI ZHU
Building class
B3 · Two-family home converted from one-family
Year built · units
1920 · 2 res.
Lot area · zoning
2,219 sq ft · R5
Market value (DOF)
$912,000 FY2027
Last priced deed
$320,000 · 2010-04-08
BBL
4018820058
BIN
4559581, 4046565

How to cite: NYC Property Facts, “47-29 98th Place, Queens, NY 11368 (BBL 4018820058)”, data as of 2026-11-05, https://nycpropertyfacts.com/ny/queens/47-29-98th-place-4018820058. Source: NYC Open Data.

Lot & building

Basic facts about the tax lot and building from the city’s PLUTO database.

Owner (as listed by the city)
WANG, LI ZHUThe owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
Building class
B3 – Two-family home converted from one-familyThe Department of Finance’s category for what kind of building this is.
Land use
One- & two-family buildingsCity Planning’s broad category of how the lot is used.
Year built
1920Often an estimate for older buildings. Major alteration recorded: 2010.
Floors
2
Units
2 residential / 2 totalResidential units are apartments; total includes stores and offices.
Buildings on lot
2
Lot size
2,219 sq ft (25 ft × 88.75 ft)
Building floor area
1,154 sq ft
Zoning
R5The zoning district sets what can be built and used here. Residential district.
Built vs. allowed density (FAR)
0.52 built / 1.50 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
Identifiers
BBL 4018820058 (Borough 4, Block 1882, Lot 58) · BIN 4559581, 4046565BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).

Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-05; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01

Tax assessment

How the Department of Finance values this lot for property tax.

Market value (tax year 2027, final roll)
$912,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
Assessed value
$54,720The portion of market value that taxes are calculated on (capped by law for small homes).
Taxable value (final)
$38,540Assessed value minus any exemptions.
Tax class
Tax class 1 – 1–3 family homes (and some small mixed-use / vacant lots)
Tax yearRollMarket valueAssessed valueTax class
2027Final$912,000$54,7201
2026Final$881,000$52,8601
2025Final$833,000$49,9801

Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-05

Sales & deed history 9

Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.

DateTypePriceSeller (grantor)Buyer (grantee)Doc ID
2010-04-08DEED$320,000Saxon Asset Securties Trust 2006-3; Deutsche Bank National Trust CompanyGao, Min Tian; Wang, Li Zhu2010041200855002
2009-01-23DEED$631,860Conlon-Muller, Esq As Referee, JaneDeutsche Bank National Trust Company, As Trustee2009012300869001
2006-07-07DEED$609,500Garay , Ludwing E; Rivera , BernelOrellana , David2006071801743001
2003-12-16DEED$359,000Serra, Clara CristinaGaray, Ludwing E; Rivera, Bernel2003122400676001
2003-05-30DEED$350,000Portillo Realty Corp.Serra, Clara Cristina2003060601339001
2002-08-21DEED$287,000Castillo, Edwardo LPortillo Realty Corp.2003012901377001
1996-04-29DEED$0 / not statedCastillo, Jenny; Castillo, Edwardo L.Castillo, Edwardo L.FT_4450005165245
1979-10-09DEED$0 / not statedMcginnis Theresa; Mouirno TheresaEdwardo L Castillo; Jenny CastilloBK_7940120300647
1971-09-24DEED$0 / not statedMouirno CarmenTheresa Mouirno; Carmen MouirnoBK_7140051200843

Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-05; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-05; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-05

DOB job filings 0 open of 3

A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.

StatusJob #TypeFiledEst. cost
Not open
SIGNED OFF · 2014-04-22
420907219
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2013-10-18$6,000
Not open
SIGNED OFF · 2014-04-29
420907228
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2013-10-15$14,540
Not open
SIGNED OFF · 2013-05-13
420185356
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2010-05-07$37,000

Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-11-01; data as of 2026-11-05; DOB Job Application Filings (BIS) — city dataset updated 2026-11-04; data as of 2026-11-05

Work permits 6

Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.

IssuedExpiresJob #WorkPermit status
2014-02-132015-02-13420907228
BIS
Plumbing / PlumbingISSUED (initial)
2014-01-062014-07-27420907228
BIS
Equipment work / Other / general constructionISSUED (initial)
2014-01-062014-07-27420907219
BIS
Equipment work / Other / general constructionISSUED (initial)
2010-08-092011-08-09420185356
BIS
Plumbing / PlumbingISSUED (initial)
2010-07-232010-09-21420185356
BIS
Equipment work / Other / general constructionISSUED (initial)
2010-07-232011-07-23420185356
BIS
Equipment work / Mechanical/HVACISSUED (initial)

Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-11-02; data as of 2026-11-05; DOB Permit Issuance (BIS) — city dataset updated 2026-10-31; data as of 2026-10-31

DOB violations 0 active of 4

Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).

StatusIssuedTypeDescriptionNumber
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2013-12-04AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*120413AEUHAZ100197
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2013-12-04AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*120413AEUHAZ100198
Resolved/dismissed
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
2009-12-12C-CONSTRUCTION OTHER OPTIONALWORK W/OUT PERMITVW*121209CNELA04
Resolved/dismissed
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
2005-11-17C-CONSTRUCTION OTHER OPTIONALVPW*111705C04HD02

Source: DOB Violations — city dataset updated 2026-11-02; data as of 2026-11-05

ECB violations (DOB) 0 active of 9

DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.

StatusIssuedSeverityWhat it was forPenalty / paid / balanceECB #
Resolved
Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED
2009-12-12CLASS - 1OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR D.O.B. RECORDS. RECORDS INDICATE 2 FAMILY. CELLAR CONVERTED INTO A CLASS'A' APT WITH NO 2ND MEANS OF EGRESS. 2 BEDROOMS NO OUTSIDE AIR & LIGHT. 1 3PC BATHROOM$12,000 / $2,524 / $034817439Y
Resolved
Hearing: WRITTEN OFF · Certification: CERTIFICATE ACCEPTED
Written off refers to the penalty, not the violation.
2008-12-11CLASS - 2FAILURE TO COMPLY W/ THE COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION W/ THE DOB FOR VIOLATION #071008C04TS03 ECB#34693308M OBSERVED AT TIME OF INSP PREMISES IS CURRENTLY OCCUPIED AS DWELLING IN CONTINUED N$800 / $0 / $034734786P
Resolved
Hearing: WRITTEN OFF · Certification: CERTIFICATE ACCEPTED
Written off refers to the penalty, not the violation.
2008-07-10CLASS - 1FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. AT TIME OF INSPECTION OBSERVED GARAGE AT REAR OF PREMISES WITH STRUCTURAL DAMAGES/DEFECTS TO EXTERIOR MASONRY WALLS AT EXPOSURES 1 AND 2. AT EXPOSURE 2 BRICK M$5,000 / $0 / $034693308M
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2013-09-14CLASS - 1WORK W/O PERMIT.OBSERVED:AT CELLAR LEVEL IN PROGRESS INSTALLATION OF NEW INTERIOR PARTITIONS W/ELECTRICAL WIRING,INSTALLED WATER,WASTE AND ELECTRIC LINE FOR STOVE AN DRESIDENTAIL SINK,WORK 80%COMPLETE.RMDY:IMM$1,600 / $1,600 / $035032329J
Resolved
Hearing: WRITTEN OFF · Certification: CERTIFICATE ACCEPTED
Written off refers to the penalty, not the violation.
2008-07-24CLASS - 2WOR W/O A PERMIT WORK NOTED:AT REAR OF PREMISES INSTALLED A OPEN AIR CANOPY APPROX. 16-0L X 12-0W X 12-0 HIGH WITH WOOD FRAME FIBER CLASS PANEL FOR ROOF ATTACHED TO GARAGE AND SUPPORTED WITH METAL POSTS REMEDY$4,000 / $0 / $034681268Z
Resolved
Hearing: WRITTEN OFF · Certification: CERTIFICATE ACCEPTED
Written off refers to the penalty, not the violation.
2007-01-11HazardousFAILURE TO MAINTAIN BLDG NOTED:AT FRONT PREMISES HANDRAIL IS MISSING APPROX:3 STEPS 3'HIGH X 4'WIDE.THE FIRST TWO STEPS ARE MISSING BRICK & CEMENT-SOME BROKEN,MISSING OR LOOSE.REMEDY:MAINTAIN BLDG(INSTALL HANDR$2,500 / $0 / $034557313K
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2013-09-14CLASS - 1WORK W/O PERMIT.OBSERVED AT REAR OF PROPERTY INSTALLED ON DETACHED GARAGE NEW CMU WALLS AT EXP#2&4, WALLS APP 9'HI X 20'LONG.AT EXP#1 INSTALLED NEW BRICK FRONT WALL W/LINTEL FOR DOOR OPENING, WALL APP 10'WIDE$1,600 / $1,600 / $035032328H
Resolved
Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED
2009-12-12CLASS - 1WORK W/O A PERMIT. WORK NOTED: ERECTED PARTITION TO CREATE 2 BEDROOMS,KITCHEN & BATHROOM. PLUMBING & ELEC WORK DONE IN CONJUNCTION WITH ERECTING WALLS TO CREATE A CELLAR APT. REMEDY: OBTAIN A PERMIT OR RESTORE$8,000 / $1,682 / $034817440L
Resolved
Hearing: WRITTEN OFF · Certification: CERTIFICATE ACCEPTED
Written off refers to the penalty, not the violation.
2007-01-11Non-HazardousWORK W/O PERMIT WORK NOTED : @ GROUND FL REAR OF PREMISE ERECTED A CANOPY APPROX 12'W X 12'L X 10'HIGH, MADE OF 2" X 4" WOOD FRAMING @ ROOF & VINYL @ ROOF REMEDY : OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDIT$2,500 / $0 / $034557312Z

Source: DOB ECB Violations — city dataset updated 2026-10-31; data as of 2026-11-05

OATH tickets (all agencies) 0 unpaid of 22

Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.

StatusDateAgencyChargeRespondentImposed / paid / balanceTicket #
No balance due
PAID IN FULL
2026-03-25Sanitation OthersIMPROPER RECEPTACLE FAILURE TO CONTAINERIZE - RESIDENTIAL 1STWANG LI ZHU$50 / $50 / $0049613301L
No balance due
PAID IN FULL
2026-03-21Dos - Enforcement AgentsIMPROPER RECEPTACLE FAILURE TO CONTAINERIZE - RESIDENTIAL 1STWANG LI ZHU$50 / $50 / $0049701323M
No balance due
PAID IN FULL
2024-02-17Sanitation OthersFAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITSWANG LI ZHU$25 / $25 / $0048120296Y
No balance due
PAID IN FULL
2015-10-31Sanitation DeptFAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITSWANG$25 / $25 / —041153962N
No balance due
PAID IN FULL
2015-09-12Sanitation DeptFAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITSWANG$25 / $25 / —044251926Y
No balance due
PAID IN FULL
2013-11-01Dos - Enforcement AgentsSTORAGE OF RECEPTACLESWANG$100 / $100 / —043752558Z
No balance due
PAID IN FULL · IN VIOLATION
2013-09-14Dept. Of BuildingsWORK WITHOUT A PERMITLI ZHU WANG$1,600 / $1,600 / —035032329J
No balance due
PAID IN FULL · IN VIOLATION
2013-09-14Dept. Of BuildingsWORK WITHOUT A PERMITLI ZHU WANG$1,600 / $1,600 / —035032328H
No balance due
PAID IN FULL
2012-01-28Dos - Enforcement AgentsNON-RECYC LEFT IN RECYC CONTAINER FOR COLLECTION 1TO8 DWELLING UNITSWANG$25 / $25 / —040826677L
No balance due Default
PAID IN FULL · DEFAULTED
2009-12-15Dos - Enforcement AgentsSTORAGE OF RECEPTACLESDEUTSCHE BANK NATIONAL TRUST C$300 / $106 / —040704779R
No balance due Default
PAID IN FULL · DEFAULT
2009-12-12Dept. Of BuildingsOCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O OR BUILDING DEPT RECORDSDEUTSCHE BANK$12,000 / $2,524 / —034817439Y
No balance due Default
PAID IN FULL · DEFAULTED
2009-12-12Dept. Of BuildingsWORK WITHOUT A PERMITDEUTSCHE BANK$8,000 / $1,683 / —034817440L

Showing 12 of 22 records. The API and the source dataset have the full list.

Source: OATH Hearings Division Case Status — city dataset updated 2026-11-02; data as of 2026-11-05

HPD registration & contacts

Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.

No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).

Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-11-04; data as of 2026-11-05; HPD Registration Contacts — city dataset updated 2026-11-04; data as of 2026-11-05

HPD housing-code violations 0 open of 0

Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-11-05; data as of 2026-11-05

HPD complaints 0

Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-05; data as of 2026-11-05

311 requests (last 12 months) 0

Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.

No records found in this dataset for this lot.

Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-05; data as of 2026-11-05

Nearby properties

On 98 Pl

Same tax block (1882)

All properties on 98 Pl, Queens · All of Queens 11368

Open-item counts as of November 5, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs