Independent site. Data from NYC Open Data; not affiliated with the City of New York.

NYC Property Factsfree public-records reference

667 Flushing Avenue, Brooklyn, NY 11206

BBL 3022720049 (Borough 3, Block 2272, Lot 49) · BIN 3429530 · Last updated: · East Williamsburg · ZIP 11206

Summary · as of November 6, 2026

667 Flushing Avenue (Brooklyn, NY 11206; tax lot BBL 3022720049) is a vacant lot (building class V1: vacant land zoned commercial), on a 9,580 sq ft lot zoned R7A. City tax records list the owner as BARTLETT CROSSING HOUSING DEVELOPMENT FU ND COMPANY; per ACRIS, a deed to this owner dated January 9, 2026 lists a price of $2 in a deed covering 2 lots. The Department of Finance's final market value for tax year 2027 is $2,174,000. As of November 6, 2026 (limited by DOB Job Application Filings (BIS); other open-item sources were confirmed later), NYC Open Data shows 12 DOB jobs with a permit issued but no sign-off and five active ECB violations. There were eight 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

Owner of record
BARTLETT CROSSING HOUSING DEVELOPMENT FU ND COMPANY
Building class
V1 · Vacant land zoned commercial
Year built · units
— · 0 res.
Lot area · zoning
9,580 sq ft · R7A
Market value (DOF)
$2,174,000 FY2027
Last priced deed
$2 · 2026-01-09
BBL
3022720049
BIN
3429530

How to cite: NYC Property Facts, “667 Flushing Avenue, Brooklyn, NY 11206 (BBL 3022720049)”, data as of 2026-11-06, https://nycpropertyfacts.com/ny/brooklyn/667-flushing-avenue-3022720049. Source: NYC Open Data.

Lot & building

Basic facts about the tax lot and building from the city’s PLUTO database.

Owner (as listed by the city)
BARTLETT CROSSING HOUSING DEVELOPMENT FU ND COMPANYThe owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
Building class
V1 – Vacant land zoned commercialThe Department of Finance’s category for what kind of building this is.
Land use
Vacant landCity Planning’s broad category of how the lot is used.
Year built
—Often an estimate for older buildings.
Floors
—
Units
0 residential / 0 totalResidential units are apartments; total includes stores and offices.
Buildings on lot
3
Lot size
9,580 sq ft (98 ft × 119 ft)
Building floor area
0 sq ft
Zoning
R7A, C2-4The zoning district sets what can be built and used here. Residential district; the overlay (C1/C2…) allows local retail on residential blocks.
Built vs. allowed density (FAR)
0.00 built / 4.00 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
Identifiers
BBL 3022720049 (Borough 3, Block 2272, Lot 49) · BIN 3429530BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).

Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; last loaded 2026-11-07; Building Footprints — city dataset updated 2026-10-25; last loaded 2026-11-01

Tax assessment

How the Department of Finance values this lot for property tax.

Market value (tax year 2027, final roll)
$2,174,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
Assessed value
$978,300The portion of market value that taxes are calculated on (capped by law for small homes).
Taxable value (final)
$619,380Assessed value minus any exemptions.
Tax class
Tax class 4 – commercial / industrial
Tax yearRollMarket valueAssessed valueTax class
2027Final$2,174,000$978,3004
2026Final$1,672,000$752,4004
2025Final$1,286,000$578,7004

Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; last loaded 2026-11-07

Sales & deed history 3

Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.

DateTypePriceSeller (grantor)Buyer (grantee)Doc ID
2026-01-09DEED$2
one deed covering 2 lots; price is for all of them
The City Of New YorkBartlett Crossing Housing Development Fund Company2026011201036001
1982-08-17DEED$0 / not stated
one deed covering 3581 lots; price is for all of them
Commissioner FinancenyNew York CityFT_3250000923125
1978-09-27DEED$0 / not statedJoseph Joe Decd; Schwartz Ruth Exec Of; Joseph Yetta3 Whipple St CorpBK_7830102200431

Source: ACRIS Real Property Master — city dataset updated 2026-10-08; last loaded 2026-11-07; ACRIS Real Property Legals — city dataset updated 2026-10-08; last loaded 2026-11-07; ACRIS Real Property Parties — city dataset updated 2026-10-08; last loaded 2026-11-07

DOB job filings 12 open of 20

A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.

StatusJob #TypeFiledEst. cost
Permitted, not signed off
Permit Entire · 2026-10-15
B00826880-S9
DOB NOW
New Building2026-10-14—
Permitted, not signed off
Permit Entire · 2026-06-01
B01401384-I1
DOB NOW
Alteration2026-05-13$1,000
Permitted, not signed off
Permit Entire · 2026-10-29
B01322833-I1
DOB NOW
Alteration2026-05-08$1,000
Permitted, not signed off
Permit Entire · 2026-08-31
B01279936-I1
DOB NOW
Alteration2025-08-31$1,000
Permitted, not signed off
Permit Entire · 2026-04-19
B00826880-S1
DOB NOW
New Building2023-09-11$1,000
Permitted, not signed off
Permit Entire · 2026-03-13
B00826880-S2
DOB NOW
New Building2023-07-13$1,000
Permitted, not signed off
Permit Entire · 2026-02-19
B00826880-S3
DOB NOW
New Building2023-05-11$1,000
Permitted, not signed off
Permit Entire · 2026-02-13
B00826880-S4
DOB NOW
New Building2023-05-01$1,000
Permitted, not signed off
Permit Entire · 2026-02-18
B00826880-S6
DOB NOW
New Building2023-05-01$1,000
Permitted, not signed off
Permit Entire · 2026-06-01
B00826880-S5
DOB NOW
New Building2023-04-28$1,000
Permitted, not signed off
Permit Entire · 2026-06-08
B00826880-S7
DOB NOW
New Building2023-04-28$1,000
Permitted, not signed off
Permit Entire · 2026-10-13
B00826880-I1
DOB NOW
New Building2023-03-21$24,554
Not open
Approved · 2026-06-01
B00826880-P5
DOB NOW
New Building2026-05-28$1,000
Not open
Objections · 2026-05-31
B00826880-P4
DOB NOW
New Building2026-05-27$1,000
Not open
Approved · 2026-06-08
B00826880-P6
DOB NOW
New Building2026-05-27$1,000
Not open
Approved · 2026-06-15
B01396567-I1
DOB NOW
Alteration2026-05-08$1,000
Not open
Approved · 2026-04-19
B00826880-P3
DOB NOW
New Building2026-02-16$1,000
Not open
Approved · 2026-03-13
B00826880-P1
DOB NOW
New Building2026-02-16$1,000
Not open
Approved · 2026-02-19
B00826880-P2
DOB NOW
New Building2026-02-16$1,000
Not open
PLAN EXAM - DISAPPROVED · 2023-11-01
340886697
BIS
A3 – Minor alteration (one type of work)2023-04-21—

Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-11-06; last loaded 2026-11-07; DOB Job Application Filings (BIS) — city dataset updated 2026-11-05; last loaded 2026-11-06; a later sync attempt failed on 2026-11-07; showing the last successful load

Work permits 24

Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.

IssuedExpiresJob #WorkPermit status
2026-10-292027-01-19B01322833-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-10-292027-01-19B01322833-I1
DOB NOW
Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-10-152027-02-21B00826880-S9
DOB NOW
Suspended Scaffold
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
Permit Issued
2026-10-132026-12-23B00826880-I1
DOB NOW
General Construction
CONSTRUCT NEW NINE (9) STORY MIXED-USE BUILDING AS PER PLANS FILED, WITH 13 INCLUSIONARY HOUSING UNITS AND 36 AFFORDABLE HOUSING UNITS PROVIDED.
Permit Issued
2026-08-312027-01-19B01279936-I1
DOB NOW
Construction Fence
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Permit Issued
2026-08-032026-11-01B01322833-I1
DOB NOW
Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-08-032026-11-01B01322833-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-06-012027-01-19B01401384-I1
DOB NOW
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Permit Issued
2026-05-152027-01-19B01322833-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-05-152026-08-13B01322833-I1
DOB NOW
Sidewalk Shed
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-05-152027-01-19B01322833-I1
DOB NOW
Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued
2026-05-152026-08-13B01322833-I1
DOB NOW
Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTE
Permit Issued

Showing 12 of 24 records. The API and the source dataset have the full list.

Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-11-06; last loaded 2026-11-07; DOB Permit Issuance (BIS) — city dataset updated 2026-11-07; last loaded 2026-11-07

DOB violations 0 active of 0

Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).

No records found in this dataset for this lot.

Source: DOB Violations — city dataset updated 2026-11-06; last loaded 2026-11-07

ECB violations (DOB) 5 active of 5

DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.

StatusIssuedSeverityWhat it was forPenalty / paid / balanceECB #
Active
Hearing: PENDING
2026-10-24CLASS - 2AT TIME OF INSPECTION, OBSERVED CONSTRUCTION SITE NOT PROPERLY SECURED. SLIDING ENTRANCE GATE WAS LEFT UNLOCKED, ALLOWING UNRESTRICTED PUBLIC ACCESS TO THE JOBSITE, CONTRARY TO BC 3307.7.2, CREATING A HAZARDOUS$2,500 / $0 / $2,50039561016H
Active
Hearing: PENDING
2026-10-24CLASS - 1AT TIME OF INSPECTION, OBSERVED MASONRY CONSTRUCTION ABOVE ADJOINING PROPERTY AT EXPOSURE 4 WITHOUT ADEQUATE FALLING-OBJECT PROTECTION, CONTRARY TO BC 3309.1, EXPOSING PARKED VEHICLES AND PERSONS TO FALLING MAS$10,000 / $0 / $10,00039561015X
Active
Hearing: PENDING
2026-10-24CLASS - 2AT TIME OF INSPECTION, OBSERVED INACTIVE JOBSITE WITH BUILDING FOOTPRINT OVER 5,000 SF. WATCHPERSON LACKED VALID NYS SECURITY GUARD REGISTRATION AND VALID WATCHPERSON CERTIFICATE FROM THE FIRE DEPARTMENT, CONTR$2,500 / $0 / $2,50039561010R
Active
Hearing: PENDING
2026-10-24CLASS - 1AT TIME OF INSPECTION, OBSERVED CEMENT BAGS STORED ON PALLETS IN ROADWAY STORAGE ZONE WITHOUT ADEQUATE SAFEGUARDS AGAINST ACCIDENTAL IMPACT OR DISPLACEMENT, CONTRARY TO BC 3303.4.5.1, CREATING A HAZARD OF DISPL$2,500 / $0 / $2,50039561017J
Active
Hearing: POP/IN-VIO
2024-08-28CLASS - 1WORK WITHOUT A PERMIT .AT TIME OF INSPECTION OF A VACANT LAND LOCATED AT THE INTERSECTION OF FLUSHING AVENUE .AND WHIPPLE ST. IN A RESIDENTIAL DISTRICT OWNED BY (HPD) I OBSERVED THE ENTRANCE OF THE VACANT PLOT$2,500 / $0 / $039123277X

Source: DOB ECB Violations — city dataset updated 2026-11-06; last loaded 2026-11-07

OATH tickets (all agencies) 0 unpaid of 7

Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.

StatusDateAgencyChargeRespondentImposed / paid / balanceTicket #
Hearing pending
NEW ISSUANCE
2026-10-24Dept. Of BuildingsMISCELLANEOUS VIOLATIONSPROCIDA CONSTRUCTION CORP$2,500 / $0 / $2,500039561010R
Hearing pending
NEW ISSUANCE
2026-10-24Dept. Of BuildingsUNSAFE STORAGE OF MATERIALS DURING CONSTRUCTION OR DEMOLITIONPROCIDA CONSTRUCTION CORP$2,500 / $0 / $2,500039561017J
Hearing pending
NEW ISSUANCE
2026-10-24Dept. Of BuildingsMISCELLANEOUS VIOLATIONSPROCIDA CONSTRUCTION CORP$2,500 / $0 / $2,500039561016H
Hearing pending
NEW ISSUANCE
2026-10-24Dept. Of BuildingsFAILED TO PROTECT ADJ. PROPERTYPROCIDA CONSTRUCTION CORP$10,000 / $0 / $10,000039561015X
No balance due
PAID IN FULL
2026-03-29Nypd Transport Intelligence DiFAILURE TO COMPLY WITH THE TERMS AND CONDITIONS OF DOT PERMITSPROCIDA CONSTRUCTION CORP$1,200 / $1,200 / $00221258539
No balance due
HEARING COMPLETED · IN VIOLATION
2025-02-05Fire Department Of NycINSPECTION AND TESTINGBROOKLYN NAVY YARD DEVELOPMENT$0 / $0 / $0014169695P
No balance due
WRITTEN OFF · POP IN-VIOL
2024-08-28Dept. Of BuildingsWORK WITHOUT A PERMITHOUSING PRESERVATION DEVELOP$2,500 / $0 / $0039123277X

Source: OATH Hearings Division Case Status — city dataset updated 2026-11-07; last loaded 2026-11-07

HPD registration & contacts

Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.

No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).

Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-11-04; last loaded 2026-11-07; HPD Registration Contacts — city dataset updated 2026-11-04; last loaded 2026-11-07

HPD housing-code violations 0 open of 0

Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-11-06; last loaded 2026-11-07

HPD complaints 0

Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-07; last loaded 2026-11-07

311 requests (last 12 months) 8

Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.

OpenedAgencyComplaintStatusClosed
2026-11-02DOBGeneral Construction/Plumbing – Site Conditions Endangering WorkersClosed2026-11-04
2026-10-08DOBEmergency Response Team (ERT) – After Hours Work - IllegalClosed2026-10-29
2026-09-16DOBGeneral Construction/Plumbing – Adjacent Buildings Not ProtectedClosed2026-09-16
2026-05-19DOBGeneral Construction/Plumbing – Cons - Contrary/Beyond Approved Plans/PermitsAssigned2026-06-09
2026-02-19DOBGeneral Construction/Plumbing – Excavation Undermining Adjacent BuildingClosed2026-02-20
2026-02-11DOBEmergency Response Team (ERT) – After Hours Work - IllegalClosed2026-02-16
2026-02-11DEPNoise – Noise: Construction Before/After Hours (NM1)Closed2026-02-13
2026-02-11DOTSidewalk Condition – Blocked - ConstructionClosed2026-02-13

Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-07; last loaded 2026-11-07

Nearby properties

Ordered by map distance among lots on this street within 40 house numbers and on this tax block within 15 lot numbers.

More in East Williamsburg: Open HPD violations · Active DOB violations · Active ECB violations · Open DOB jobs · Unpaid OATH tickets

Closest on Flushing Ave

All properties on Flushing Ave, Brooklyn · Brooklyn 11206

Open-item counts as of November 6, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs