5122 9th Avenue, Brooklyn, NY 11220
BBL 3056510046 (Borough 3, Block 5651, Lot 46) · BIN 3424644, 3138167 · Last updated:
Summary · as of November 6, 2026
5122 9th Avenue (Brooklyn, NY 11220; tax lot BBL 3056510046) is a 2-unit mixed-use building with apartments and ground-floor commercial space (building class S2: mixed-use: two-family home with one store or office), built around 2021, on a 1,605 sq ft lot zoned R6. City tax records list the owner as 45 ZL LLC; the most recent deed with a stated price is dated August 5, 2008 at $715,000 (per ACRIS). The Department of Finance's final market value for tax year 2027 is $2,260,000. As of November 6, 2026, NYC Open Data shows one DOB job with a permit issued but no sign-off and five OATH tickets with an unpaid balance. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)
- Owner of record
- 45 ZL LLC
- Building class
- S2 · Mixed-use: two-family home with one store or office
- Year built · units
- 2021 · 2 res.
- Lot area · zoning
- 1,605 sq ft · R6
- Market value (DOF)
- $2,260,000 FY2027
- Last priced deed
- $715,000 · 2008-08-05
- BBL
- 3056510046
- BIN
- 3424644, 3138167
- 1Open DOB jobs (permit issued, no sign-off)
- 0Active DOB violations
- 0Active ECB violations
- 0Open HPD violations
- 5OATH tickets with unpaid balance
How to cite: NYC Property Facts, “5122 9th Avenue, Brooklyn, NY 11220 (BBL 3056510046)”, data as of 2026-11-06, https://nycpropertyfacts.com/ny/brooklyn/5122-9th-avenue-3056510046. Source: NYC Open Data.
Lot & building
Basic facts about the tax lot and building from the city’s PLUTO database.
- Owner (as listed by the city)
- 45 ZL LLCThe owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
- Building class
- S2 – Mixed-use: two-family home with one store or officeThe Department of Finance’s category for what kind of building this is.
- Land use
- Mixed residential & commercialCity Planning’s broad category of how the lot is used.
- Year built
- 2021Often an estimate for older buildings.
- Floors
- 4
- Units
- 2 residential / 3 totalResidential units are apartments; total includes stores and offices.
- Buildings on lot
- 1
- Lot size
- 1,605 sq ft (20 ft × 80.25 ft)
- Building floor area
- 4,396 sq ft (incl. 1,321 sq ft commercial)
- Zoning
- R6The zoning district sets what can be built and used here. Residential district.
- Built vs. allowed density (FAR)
- 2.74 built / 2.43 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
- Identifiers
- BBL 3056510046 (Borough 3, Block 5651, Lot 46) · BIN 3424644, 3138167BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).
Agency lookups: DOB BIS · ZoLa (zoning map) · ACRIS
Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-07; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01
Tax assessment
How the Department of Finance values this lot for property tax.
- Market value (tax year 2027, final roll)
- $2,260,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
- Assessed value
- $135,600The portion of market value that taxes are calculated on (capped by law for small homes).
- Taxable value (final)
- $109,328Assessed value minus any exemptions.
- Tax class
- Tax class 1 – 1–3 family homes (and some small mixed-use / vacant lots)
| Tax year | Roll | Market value | Assessed value | Tax class |
|---|---|---|---|---|
| 2027 | Final | $2,260,000 | $135,600 | 1 |
| 2026 | Final | $1,719,000 | $103,140 | 1 |
| 2025 | Final | $1,404,000 | $84,240 | 1 |
Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-06
Sales & deed history 6
Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.
| Date | Type | Price | Seller (grantor) | Buyer (grantee) | Doc ID |
|---|---|---|---|---|---|
| 2019-01-17 | DEED | $0 / not stated | Cheung, Tin Chuei; Shi, Hui | 45 Zl Llc | 2019012301236001 |
| 2008-08-05 | DEED | $715,000 | Stacey, Nancy; Stacey, Thomas W | Chuei Cheung, Tin; Shi, Hui | 2008081800127004 |
| 2003-10-16 | DEED | $185,000 | Stacey, Mary Jane | Stacey, Thomas W; Stacey, Nancy | 2003102302459001 |
| 1984-08-23 | DEED | $0 / not stated | Frankel, Harold | Stacey, Joseph S; Stacey, Mary Jane | FT_3160001041716 |
| 1984-03-08 | DEED | $0 / not stated | Maccarino, Louis; Maccarino, Eileen | Frankel, Harold | FT_3950001007695 |
| 1980-12-05 | DEED | $0 / not stated | Cush Jeanette | Maccarino Louis; Maccarino Eileen | BK_8030120200540 |
Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-06; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-06; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-06
DOB job filings 1 open of 18
A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.
| Status | Job # | Type | Filed | Est. cost |
|---|---|---|---|---|
| Permitted, not signed off PERMIT ISSUED - ENTIRE JOB/WORK · 2008-12-23 | 310238800 BIS | A3 – Minor alteration (one type of work) | 2008-12-23 | — |
| Not open Approved · 2025-04-18 | B01187175-P2 DOB NOW | Alteration | 2025-04-18 | $40,000 |
| Not open Approved · 2025-04-08 | B01187175-P1 DOB NOW | Alteration | 2025-04-08 | $40,000 |
| Not open LOC Issued · 2025-04-25 | B01187175-I1 DOB NOW | Alteration | 2025-02-27 | $40,000 |
| Not open LOC Issued · 2025-04-10 | B01187179-I1 DOB NOW | Alteration | 2025-02-27 | $40,000 |
| Not open Approved · 2023-08-29 | B00521373-P2 DOB NOW | Alteration | 2023-08-14 | $53,963 |
| Not open Approved · 2023-07-11 | B00521373-P1 DOB NOW | Alteration | 2023-04-25 | $53,963 |
| Not open LOC Issued · 2024-04-02 | B00521373-I1 DOB NOW | Alteration | 2021-05-14 | $53,963 |
| Not open LOC Issued · 2023-09-01 | B00402280-I1 DOB NOW | Alteration | 2020-09-25 | $8,000 |
| Not open LOC Issued · 2023-09-05 | B00200360-I1 DOB NOW | Alteration | 2019-07-26 | $1,000 |
| Not open LOC Issued · 2022-12-22 | B00125082-I1 DOB NOW | Alteration | 2019-02-10 | $1,000 |
| Not open SIGNED OFF · 2019-05-23 | 321754124 BIS | DM – Demolition | 2018-05-31 | — |
| Not open APPLICATION PROCESSED - NO PLAN EXAM · 2016-11-04 | 321421261 BIS | DM – Demolition | 2016-11-04 | — |
| Not open SIGNED OFF · 2024-04-18 | 320939918 BIS | A3 – Minor alteration (one type of work) | 2015-11-10 | — |
| Not open SIGNED OFF · 2024-08-16 | 320993528 BIS | NB – New building | 2015-08-20 | — |
| Not open PLAN EXAM - DISAPPROVED · 2014-07-22 | 320736799 BIS | NB – New building | 2013-09-13 | — |
| Not open PLAN EXAM - DISAPPROVED · 2013-04-12 | 320533295 BIS | NB – New building | 2012-08-08 | — |
| Not open PLAN EXAM - APPROVED · 2009-06-03 | 310222130 BIS | NB – New building | 2008-11-06 | — |
Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-11-06; data as of 2026-11-07; DOB Job Application Filings (BIS) — city dataset updated 2026-11-05; data as of 2026-11-06
Work permits 31
Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.
| Issued | Expires | Job # | Work | Permit status |
|---|---|---|---|---|
| 2025-03-05 | 2025-04-21 | B01187179-I1 DOB NOW | Plumbing RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | Signed-off |
| 2025-03-04 | 2025-10-17 | B01187175-I1 DOB NOW | General Construction RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. NO CHANGE IN USE,EGRESS OR OCCUPA | Signed-off |
| 2023-05-08 | 2024-05-07 | 320993528 BIS | New building | ISSUED (renewal) |
| 2023-05-08 | 2024-05-07 | 320993528 BIS | Foundation | ISSUED (renewal) |
| 2023-05-08 | 2024-05-07 | 320993528 BIS | Foundation | ISSUED (renewal) |
| 2023-03-22 | 2023-08-31 | B00521373-I1 DOB NOW | Sprinklers PROPOSED 56 NEW SPRINKLER HEADS AUTOMATIC SPRINKLER SYSTEM IN CONJUNCTION WITH JOB NB# 320993528. | Signed-off |
| 2023-03-03 | 2024-03-02 | 320993528 BIS | Construction equipment (scaffold, fence, shed) / Construction equipment | ISSUED (renewal) |
| 2023-02-14 | 2024-02-14 | 320993528 BIS | Plumbing / Plumbing | ISSUED (initial) |
| 2022-11-02 | 2023-11-02 | B00402280-I1 DOB NOW | Sidewalk Shed PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 | Signed-off |
| 2022-07-06 | 2023-05-08 | 320993528 BIS | New building | ISSUED (renewal) |
| 2022-02-10 | 2022-05-08 | 320993528 BIS | New building | ISSUED (renewal) |
| 2022-02-01 | 2023-02-01 | 320993528 BIS | Construction equipment (scaffold, fence, shed) / Construction equipment | ISSUED (renewal) |
Showing 12 of 31 records. The API and the source dataset have the full list.
Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-11-06; data as of 2026-11-07; DOB Permit Issuance (BIS) — city dataset updated 2026-10-31; data as of 2026-10-31
DOB violations 0 active of 6
Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).
| Status | Issued | Type | Description | Number |
|---|---|---|---|---|
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2022-09-13 | C-CONSTRUCTION OTHER OPTIONAL | DUE TO THE WITHDRAWAL OF THE CONSTRUCTION SUPERINTENDENT OF RECORD THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED ALL WORK UNDER JOB 320993528 STOPPED UNTIL A NEW SUPERINTENDENT IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE A.C. KINDLY CONTACT THE COMMISSIONERS OFFICE AT 718 802-3677 IN RESPONSE TO THIS LETTER. | V*091322C22-03565 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2022-09-13 | C-CONSTRUCTION OTHER OPTIONAL | DUE TO THE WITHDRAWAL OF THE CONSTRUCTION SUPERINTENDENT OF RECORD THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED ALL WORK UNDER JOB 320993528 STOPPED UNTIL A NEW SUPERINTENDENT IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE A.C. KINDLY CONTACT THE COMMISSIONERS OFFICE AT 718 802-3677 IN RESPONSE TO THIS LETTER. | V*091322C22-03566 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2022-04-27 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | V*042722AEUHAZ100297 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2021-05-26 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | V*052621AEUHAZ100343 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2021-05-26 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | V*052621AEUHAZ100342 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2019-01-09 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | V*010919AEUHAZ100830 |
Source: DOB Violations — city dataset updated 2026-11-06; data as of 2026-11-07
ECB violations (DOB) 0 active of 13
DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.
| Status | Issued | Severity | What it was for | Penalty / paid / balance | ECB # |
|---|---|---|---|---|---|
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2018-11-17 | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35355300M ISSUED ON 09/28/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR HAVING NO ROOF AT THE | $0 / $0 / $0 | 35391732Y |
| Resolved Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED | 2021-03-01 | CLASS - 1 | FAILURE TO MAINTAIN.DISPLAY DOCUMENTS ON SITE AT THE TIME OF MY INSPECTION I OBSERVED MAKESHIFT TEMPORARY WORK PLATFORM INSTALLED ON EXTERIOR WALL AT 2ND.3RD AND 4TH STORY LEVEL EXP #2 PLATFORM CONSTRUCTED OF M | $6,250 / $0 / $6,250 | 35552658J |
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2021-09-08 | CLASS - 2 | TEMP CONST EQUIPMENT PERMIT EXPIRED-SWS ATOI OF PROPOSED 4STYNB,NO ACTIVE WORK OBSERVED SWS IN PLACE@EXP1 AFTER RESEARCH IN BIS IT CAME TO MY ATTN THAT PERMIT EXPIRED.RENEW PERMIT FOR SWS. | $0 / $0 / $0 | 35589743N |
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2022-01-31 | CLASS - 1 | UNLAWFULLY CONTD WORK WHILE ON NOTICE OF SWO.ATOI I OBSERVED PARAPET WALL HAS BEEN COMPLETED@EXP2&4@ROOF LEVEL.JOBSITE WAS ISSUED PARTIAL SWO FOR ALL EXTERIOR WORK@EXP2&4 ROOF LEVEL ON3/1/21.WHEN SWO WAS ISSUED | $5,000 / $0 / $5,000 | 35639652K |
| Resolved Hearing: DISMISSED · Certification: CERTIFICATE ACCEPTED | 2022-01-31 | CLASS - 1 | FAILURE TO PROVIDE SWS WHERE REQUIRED.ATOI I OBSERVED THAT THERES NO SWS PROVIDED TO PROTECT PUBLIC FROM ANY FALLING DEBRIS OR MATERIALS.BLDG FINAL HT OVER40'&APRX8' FROM SW TO STRUCTURE.MATERIALS&DEBRIS HAD FA | $0 / $0 / $0 | 35639653M |
| Resolved Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED | 2021-03-01 | CLASS - 2 | WORK WITHOUT A PERMIT AT THE TIME OF MY INSPECTION OF A 4 STORY NB AT ROOF LEVEL I OBSERVED A TEMPORARY OUTRIGGER CATCH PLATFORM.WORK PLATFORM WITH WOOD GUARDRAIL SYSTEM INSTALLED AT EXP #4 EXTERIOR ALL ON 2ND | $3,125 / $0 / $3,125 | 35552659L |
| Resolved Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED | 2021-03-01 | CLASS - 1 | BC3309.10=PROTECTION OF ROOTS AT THE TIME OF MY INSPECTION OF A 4 STORY NB CURRENTLY AT ROOF LEVEL ACTIVE JOB SITE I OBSERVED EXTEIROR WORK BEING DONE MORE THAN 48 INCHES ABOVE ADJACENT PROPERTY ROOF AT EXP #2 | $6,250 / $0 / $6,250 | 35552657H |
| Resolved Hearing: STIPULATION/IN-VIO · Certification: CERTIFICATE ACCEPTED | 2019-04-23 | CLASS - 2 | SEC. 3306.9.8.3 FAILURE TO REMOVE GLASS PRIOR TO THE COMMENCEMENT OF DEMO. AT THE TIME OF MY INSPECTION OF A 2 STY DEMO OF A HOUSE I OBSERVED FROM THE OUTSIDE OF THE SITE TRHRU THE VIEWING PANEL. THE GLASS DOOR | $620 / $620 / $0 | 35385933J |
| Resolved Hearing: STIPULATION/IN-VIO · Certification: CERTIFICATE ACCEPTED | 2021-09-08 | CLASS - 2 | TEMP CONST EQUIPMENT ONSITE-PERMIT EXPIRED-FENCE ATOI OF PROPOSED 4STYNB,OBSERVED CONST FENCE IN PLACE-PER MY RESEARCH IN BIS,IT CAME TO MY ATTN THAT PERMIT FOR FENCE EXPIRED.RENEW PERMIT FOR BLDG CODE. | $1,250 / $620 / $630 | 35589742L |
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2018-09-28 | CLASS - 1 | FAILURE TO MAINTAIN BUILDING CODE COMPLIANT NOTED:AT REAR THE ONE STORY YARD EXTENSION ENTRY HASNO ROOF SHEETING WITH EXPOSED RAFTERS ALLOWING THE ELEMENTS TO ENTER THIS DEMI ATTACHED BUILDING.COMPLY WITH CODE- | $0 / $0 / $0 | 35355300M |
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2018-12-28 | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOALTION # 35355300M ISSUED ON 9/28/18AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-20.1 AND RCNY 102-07 FOR HAVING NO ROOF AT | $0 / $0 / $0 | 35393160R |
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2019-02-06 | CLASS - 2 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35355300M ISSUED ON 09-28-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR BLDG AT THE REAR BEING W/O A ROOF. REMEDY: COMPLY W/COMM'S | $0 / $0 / $0 | 35394456K |
| Resolved Hearing: DISMISSED · Certification: N/A - DISMISSED | 2022-01-31 | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST OPS.ATOI IOBSERVED MATERIALS/DEBRIS HAD FALLEN FROM ROOF ONTO ADJOINING BLDG ROOF,CAUSING DAMAGES IN MULTIPLE LOCATIONS.PERMIT HOLDER FAILED TO PROVID | $0 / $0 / $0 | 35639651Z |
Source: DOB ECB Violations — city dataset updated 2026-11-06; data as of 2026-11-07
OATH tickets (all agencies) 5 unpaid of 39
Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.
| Status | Date | Agency | Charge | Respondent | Imposed / paid / balance | Ticket # |
|---|---|---|---|---|---|---|
| Unpaid balance DOCKETED · IN VIOLATION | 2022-01-31 | Dept. Of Buildings | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER | FORTUNA CONSTRUCTION LLC | $5,000 / $0 / $5,000 | 035639652K |
| Unpaid balance DOCKETED · STIPULATED | 2021-09-08 | Dept. Of Buildings | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT | FORTUNA CONSTRUCTION LLC | $1,250 / $620 / $630 | 035589742L |
| Unpaid balance Default DOCKETED · DEFAULTED | 2021-03-01 | Dept. Of Buildings | WORK WITHOUT A PERMIT | FORTUNA CONSTRUCTION LLC | $3,125 / $0 / $3,125 | 035552659L |
| Unpaid balance Default DOCKETED · DEFAULTED | 2021-03-01 | Dept. Of Buildings | FAILURE TO MAINTAIN DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER33 | FORTUNA CONSTRUCTION LLC | $6,250 / $0 / $6,250 | 035552658J |
| Unpaid balance Default DOCKETED · DEFAULTED | 2021-03-01 | Dept. Of Buildings | MISCELLANEOUS VIOLATIONS | FORTUNA CONSTRUCTION LLC | $6,250 / $0 / $6,250 | 035552657H |
| No balance due HEARING COMPLETED · DISMISSED | 2022-01-31 | Dept. Of Buildings | FAILURE PROVIDE SIDEWALK SHED WHERE REQUIRED | FORTUNA CONSTRUCTION LLC | $0 / $0 / $0 | 035639653M |
| No balance due HEARING COMPLETED · DISMISSED | 2022-01-31 | Dept. Of Buildings | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION | FORTUNA CONSTRUCTION LLC | $0 / $0 / $0 | 035639651Z |
| No balance due HEARING COMPLETED · DISMISSED | 2021-09-08 | Dept. Of Buildings | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT | FORTUNA CONSTRUCTION LLC | $0 / $0 / $0 | 035589743N |
| No balance due PAID IN FULL · STIPULATED | 2019-04-23 | Dept. Of Buildings | MISCELLANEOUS VIOLATIONS | SUPERB PROPERTY ANGT | $620 / $620 / $0 | 035385933J |
| No balance due PAID IN FULL | 2019-03-03 | Sanitation Others | DIRTY SIDEWALK DIRTY AREA | 45 ZL LLC | $100 / $100 / $0 | 0206784930 |
| No balance due PAID IN FULL | 2019-02-13 | Dos - Enforcement Agents | SNOW,ICE DIRT ON SIDEWALKS | 45 ZL LLC | $100 / $100 / $0 | 045192243Y |
| No balance due HEARING COMPLETED · DISMISSED | 2019-02-06 | HUI SHI | $0 / $0 / $0 | 035394456K |
Showing 12 of 39 records. The API and the source dataset have the full list.
Source: OATH Hearings Division Case Status — city dataset updated 2026-11-06; data as of 2026-11-06
HPD registration & contacts
Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.
No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).
Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-11-04; data as of 2026-11-06; HPD Registration Contacts — city dataset updated 2026-11-04; data as of 2026-11-06
HPD housing-code violations 0 open of 0
Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.
No records found in this dataset for this lot.
Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-11-05; data as of 2026-11-06
HPD complaints 0
Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.
No records found in this dataset for this lot.
Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-06; data as of 2026-11-06
311 requests (last 12 months) 0
Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.
No records found in this dataset for this lot.
Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-06; data as of 2026-11-06
Nearby properties
More in Sunset Park (Central): Open HPD violations · Active DOB violations · Active ECB violations · Open DOB jobs · Unpaid OATH tickets
On 9 Ave
- 5123 9th Avenue (three open items)
- 5120 9th Avenue (one open item)
- 5124 9th Avenue (two open items)
- 5125 9th Avenue
- 5119 9th Avenue (one open item)
- 5116 9th Avenue
- 5115 9th Avenue (one open item)
- 5113 9th Avenue (two open items)
- 5212 9th Avenue
- 5213 9th Avenue (one open item)
Same tax block (5651)
- 5123 8th Avenue (two open items)
- 5121 8th Avenue (13 open items)
- 5117 8th Avenue (12 open items)
- 5115 8th Avenue (five open items)
- 5113 8th Avenue (34 open items)
- 5111 8th Avenue (two open items)
- 5109 8th Avenue (six open items)
- 5105 8th Avenue (two open items)
- 5103 8th Avenue (26 open items)
- 5101 8th Avenue (four open items)
Open-item counts as of November 6, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs