Independent site. Data from NYC Open Data; not affiliated with the City of New York.

NYC Property Factsfree public-records reference

4729 3rd Avenue, Bronx, NY 10458

BBL 2030410045 (Borough 2, Block 3041, Lot 45) · BIN 2011420 · Last updated:

Summary · as of October 31, 2026

4729 3rd Avenue (Bronx, NY 10458; tax lot BBL 2030410045) is a hotel (building class H3: hotel (subtype H3)), built around 2025, on a 7,072 sq ft lot zoned C4-5X. City tax records list the owner as 2918 ARNOW REAL ESTATE CORP.; per ACRIS, a deed to this owner dated August 8, 2006 lists a price of $307,000. The Department of Finance's final market value for tax year 2027 is $864,000. As of October 31, 2026, NYC Open Data shows six DOB jobs with a permit issued but no sign-off, 18 active ECB violations and 17 OATH tickets with an unpaid balance. There were five 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

Owner of record
2918 ARNOW REAL ESTATE CORP.
Building class
H3 · Hotel
Year built · units
2025 · 0 res.
Lot area · zoning
7,072 sq ft · C4-5X
Market value (DOF)
$864,000 FY2027
Last priced deed
$307,000 · 2006-08-08
BBL
2030410045
BIN
2011420

How to cite: NYC Property Facts, “4729 3rd Avenue, Bronx, NY 10458 (BBL 2030410045)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/bronx/4729-3rd-avenue-2030410045. Source: NYC Open Data.

Lot & building

Basic facts about the tax lot and building from the city’s PLUTO database.

Owner (as listed by the city)
2918 ARNOW REAL ESTATE CORP.The owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
Building class
H3 – Hotel (subtype H3)The Department of Finance’s category for what kind of building this is.
Land use
Commercial & officeCity Planning’s broad category of how the lot is used.
Year built
2025Often an estimate for older buildings.
Floors
—
Units
0 residential / 98 totalResidential units are apartments; total includes stores and offices.
Buildings on lot
1
Lot size
7,072 sq ft (123.92 ft × 115.58 ft)
Building floor area
43,789 sq ft
Zoning
C4-5XThe zoning district sets what can be built and used here. Commercial district.
Built vs. allowed density (FAR)
6.19 built / 5.00 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
Identifiers
BBL 2030410045 (Borough 2, Block 3041, Lot 45) · BIN 2011420BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).

Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-01; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01

Tax assessment

How the Department of Finance values this lot for property tax.

Market value (tax year 2027, final roll)
$864,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
Assessed value
$388,800The portion of market value that taxes are calculated on (capped by law for small homes).
Taxable value (final)
$346,950Assessed value minus any exemptions.
Tax class
Tax class 4 – commercial / industrial
Tax yearRollMarket valueAssessed valueTax class
2027Final$864,000$388,8004
2026Final$864,000$388,8004
2025Final$818,000$368,1004

Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-01

Sales & deed history 2

Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.

DateTypePriceSeller (grantor)Buyer (grantee)Doc ID
2006-08-08DEED$307,0001770 Properties Ltd.2918 Arnow Real Estate Corp.2006081101659001
1982-05-18DEED$0 / not statedSun Refining & Marketing; Sun Oil Company/Pa./Fka1770 Properties LtdFT_2840000566084

Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-01; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-01; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-01

DOB job filings 6 open of 12

A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.

StatusJob #TypeFiledEst. cost
Permitted, not signed off
Permit Entire · 2025-06-25
X01084402-I1
DOB NOW
Alteration2024-07-23$10,000
Permitted, not signed off
Permit Entire · 2024-10-04
X01078896-I1
DOB NOW
Alteration2024-07-12$5,000
Permitted, not signed off
Permit Entire · 2025-03-04
X01041077-I1
DOB NOW
Alteration2024-04-24$5,000
Permitted, not signed off
PERMIT ISSUED - ENTIRE JOB/WORK · 2023-12-13
240184867
BIS
A3 – Minor alteration (one type of work)2017-05-26—
Permitted, not signed off
PERMIT ISSUED - ENTIRE JOB/WORK · 2017-08-14
220538700
BIS
A2 – Alteration with multiple work types (no change to use/occupancy)2017-04-12$27,000
Permitted, not signed off
PERMIT ISSUED - ENTIRE JOB/WORK · 2026-08-14
220493240
BIS
NB – New building2015-12-16—
Not open
Approved · 2024-10-04
X01078896-P1
DOB NOW
Alteration2024-10-03$5,000
Not open
LOC Issued · 2025-03-06
X01011895-I1
DOB NOW
Alteration2024-03-19$5,000
Not open
On Hold - Special Inspector Withdrew · 2024-01-08
X08002981-I1
DOB NOW
Alteration2022-10-19$8,000
Not open
SIGNED OFF · 2016-08-22
220492964
BIS
DM – Demolition2015-12-16—
Not open
PLAN EXAM - DISAPPROVED · 2010-05-17
220053518
BIS
NB – New building2010-03-26—
Not open
PLAN EXAM - DISAPPROVED · 2009-10-05
210109915
BIS
NB – New building2009-01-30—

Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-10-31; data as of 2026-11-01; DOB Job Application Filings (BIS) — city dataset updated 2026-10-30; data as of 2026-10-31

Work permits 36

Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.

IssuedExpiresJob #WorkPermit status
2026-08-142027-08-14220493240
BIS
Plumbing / PlumbingISSUED (renewal)
2025-12-242027-01-10220493240
BIS
FoundationISSUED (renewal)
2025-12-242027-01-10220493240
BIS
FoundationISSUED (renewal)
2025-12-242026-12-24220493240
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2025-12-152026-12-13220493240
BIS
New buildingISSUED (renewal)
2025-06-252026-06-25X01084402-I1
DOB NOW
Protection and Mechanical Methods
SINGLE #6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALT, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Permit Issued
2025-04-232026-04-23220493240
BIS
Plumbing / PlumbingISSUED (renewal)
2025-03-042026-03-04X01041077-I1
DOB NOW
Sidewalk Shed
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDI
Permit Issued
2024-12-242025-12-20220493240
BIS
FoundationISSUED (renewal)
2024-12-242025-12-24220493240
BIS
Construction equipment (scaffold, fence, shed) / Construction equipmentISSUED (renewal)
2024-12-242025-12-20220493240
BIS
FoundationISSUED (renewal)
2024-12-242025-12-13220493240
BIS
New buildingISSUED (renewal)

Showing 12 of 36 records. The API and the source dataset have the full list.

Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-10-31; data as of 2026-11-01; DOB Permit Issuance (BIS) — city dataset updated 2026-10-31; data as of 2026-10-31

DOB violations 0 active of 8

Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).

StatusIssuedTypeDescriptionNumber
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-12-11AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*121124AEUHAZ100387
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-09-18AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*091824AEUHAZ100035
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-07-24AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*072424AEUHAZ100056
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-06-12AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*061224AEUHAZ100062
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-05-15AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*051524AEUHAZ100059
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2024-05-01AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*050124AEUHAZ100051
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2018-07-11AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*071118AEUHAZ100207
Resolved/dismissed
V*-DOB VIOLATION - DISMISSED
2018-02-07AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATIONV*020718AEUHAZ100240

Source: DOB Violations — city dataset updated 2026-10-31; data as of 2026-11-01

ECB violations (DOB) 18 active of 39

DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.

StatusIssuedSeverityWhat it was forPenalty / paid / balanceECB #
Resolved
Hearing: DEFAULT · Certification: COMPLIANCE-INSP/DOC
2020-01-04CLASS - 2FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION NO CERTIFICATE ON FILE FOR ECB VIOLATION NUMBER: 35407081N, FILE A CER$3,125 / $0 / $3,12539015242H
Resolved
Hearing: DISMISSED · Certification: N/A - DISMISSED
2024-07-23CLASS - 2FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE. 9 STORY CONCRETE CAST-IN-PLACE BUILDING CONCRETE PLACEMENT UP TO FLOOR #4$0 / $0 / $035683830M
Resolved
Hearing: DISMISSED · Certification: N/A - DISMISSED
2018-09-26CLASS - 2FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION #35289006Z ISSUED ON 11/15/17 &D TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIO$0 / $0 / $035389259P
Active
Hearing: IN VIOLATION · Certification: NO COMPLIANCE RECORDED
2024-02-29CLASS - 1AT TIME OF INSPECTION ON A NB OBSERVE STREET YODOCK FOR PEDESTRIAL AT EXPOSURE #1 WAS NOT 1/2 FULL AS REQUIRED BY MANUFACTURER SPECIFICATION ALSO SOME YODOCKS WAS NOT ATTACHED TOGETHER CREATE AN UNSAFE CONDI$2,500 / $2,500 / $039525999J
Resolved
Hearing: ADMIT/IN-VIO · Certification: CERTIFICATE ACCEPTED
2023-04-12CLASS - 2PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL CONSTRUCTION SIGN NOT PROVIDED OR NOT IN COMPLIANCE WITH SECTION.AS NOTED:AT TIME OF INSPECTION OBSERVED PLYWOOD FENCE AT ALL EXPOSURES WITH VIEW PANEL BUT$1,250 / $1,250 / $035670904N
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2022-12-13CLASS - 2MISSING ACTIVE PERMITS AT CONSTRUCTION SITE.INSTALLED/DISPLAY PERMITS AT CONSTRUCTION SITE.$300 / $300 / $039510316J
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2022-12-13CLASS - 1CONSTRUCTION MACHINERY UNSAFELY STORED LEFT UNGUARDED.SAFELY STORED CONSTRUCTION MACHINERY ONSITE.$2,500 / $2,500 / $039510314X
Active
Hearing: DEFAULT · Certification: NO COMPLIANCE RECORDED
2025-04-30CLASS - 2OBSERVED ACTIVE 9 STORY JOBSITE. UPON REVIEW ON REQUIRED DOCUMENTS TO BE KEPT ON SITE, THE 6 MONTH INSPECTION LETTER, THE TEMPORARY STANDPIPE PLANS, AND THE HYDROSTATIC TEST REPORT FOR THE STANDPIPE WAS NOT PRO$6,250 / $0 / $6,25039539694X
Resolved
Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED
2016-11-23CLASS - 2JOB SITE FENCE NOT MAINTAINED PURSUANT TO SUBSECTION.NOTE: AT TIME OF INSPECTION OF A COMPLAINT #2234922 OF FANCE LEANING. I OBSERVED SITE FILLED AND () AND FENCE ERECTED. NO CONSTRUCTION ACTIVITY.I OBSERVED$2,000 / $2,383 / $035211897L
Active
Hearing: IN VIOLATION · Certification: NO COMPLIANCE RECORDED
2024-02-29CLASS - 1INCIDENT 42890 (2387213) WHERE A SIDEWALK SHED WAS HIT AND IN A PARTIALLY COLLAPSING CONDITION. INSPECTION REVEAL THAT CONCRETE TRUCK FOR CONCRETE OPERATION HIT AND PARTIALLY COLLAPSE PEDESTRIAN PROTECTION ON A$5,000 / $5,000 / $039526000J
Active
Hearing: DEFAULT · Certification: NO COMPLIANCE RECORDED
2026-02-07CLASS - 2OBSERVED EXCESSIVE ACCUMULATION OF SNOW AND ICE ON THE PUBLIC SIDEWALK ALONG EXPOSURE 3. THE SIDEWALK WAS NOT CLEARED TO PROVIDE A SAFE AND UNOBSTRUCTED PATH OF TRAVEL FOR PEDESTRIAN . COMPLY WITH BC 3301.1PROV$10,000 / $0 / $10,00039550030K
Active
Hearing: DEFAULT · Certification: NO COMPLIANCE RECORDED
2024-02-29CLASS - 2CONSTRUCTION FENCE AT EXPOSURE 2 WAS NOT AS PER CODE AND NOT FULLY ENCLOSING CONSTRUCTION SITE. A MAKESHIFT TARPAULIN AND LUMBER WAS PROVIDED THAT WAS PARTIALLY FALLING APART AND NOT BUILT SOLID (WOOD/METAL). F$10,000 / $0 / $10,00039525998H
Resolved
Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED
2026-03-17CLASS - 29 STORY NB CLOSED SITE. OBSERVED JOBSITE FENCE NOT PROPERLY MAINTAINED PERMIT#220493240 ACTIVE. OBSERVED MULTIPLE DEFECTS.OBSERVED FENCE NOT PROPERLY MAINTAINED AT EXP#1,3,4. HIGH PEDESTRIAN TRAFFIC AREA. MISSI$2,500 / $0 / $2,50039551889H
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2024-09-25CLASS - 2OBSERVED NEEDLE BEAMS CONTRARY TO DOB APPROVED DRAWING. DRAWINGS SHOW TWO STEEL BEAMS, 1 TOP AND 1 BOTTOM, IT ALSO SHOWED THREADED ROD CLAMPS TO BE INSTALLED THROUGH THE 2ND FL SLAB, 2 FULL PLANKS TO BE PLACED$1,250 / $1,250 / $039532765M
Resolved
Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED
2022-12-13CLASS - 2CONSTRUCTION PROJECT INFORMATION PANEL SIGN MISSING AT ALL EXPOSURES.INSTALLED/DISPLAY PROJECT INFORMATION PANEL SIGN$1,250 / $1,250 / $039510315H

Showing 15 of 39 records. The API and the source dataset have the full list.

Source: DOB ECB Violations — city dataset updated 2026-10-31; data as of 2026-11-01

OATH tickets (all agencies) 17 unpaid of 90

Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.

StatusDateAgencyChargeRespondentImposed / paid / balanceTicket #
Unpaid balance Default
DEFAULTED · DEFAULTED
2026-04-21Pcs - DohmhFAIL TO ELIMINATE RODENT INFESTATION SHOWN BY ACTIVE RODENT SIGNS 1STCORP$600 / $0 / $6000803816640
Unpaid balance Default
DEFAULTED · DEFAULTED
2026-04-21Pcs - DohmhFAIL TO ELIMINATE CONDITIONS CONDUCIVE TO RODENT-DEBRIS,VEGETATION 1STCORP$600 / $0 / $6000803816631
Unpaid balance Default
DEFAULTED · DEFAULTED
2026-04-21Pcs - DohmhFAIL TO ELIMINATE CONDITIONS CONDUCIVE TO PESTS, GARBAGE CANS SPILLAGECORP$600 / $0 / $6000803816622
Unpaid balance Default
DOCKETED · DEFAULTED
2026-02-07Dept. Of BuildingsMISCELLANEOUS VIOLATIONSPRIME CONSTRUCTION USA$10,000 / $0 / $10,000039550030K
Unpaid balance Default
DEFAULTED · DEFAULTED
2025-10-27Pcs - DohmhFAIL TO ELIMINATE CONDITIONS CONDUCIVE TO RODENT-DEBRIS,VEGETATION 1STC O MANAGEMENT$600 / $0 / $6000803658644
Unpaid balance Default
DEFAULTED · DEFAULTED
2025-10-27Pcs - DohmhFAIL TO ELIMINATE RODENT INFESTATION SHOWN BY ACTIVE RODENT SIGNS 1STC O MANAGEMENT$600 / $0 / $6000803658653
Unpaid balance Default
DOCKETED · DEFAULTED
2025-04-30Dept. Of BuildingsFAILURE TO MAINTAIN DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER33PRIME CONSTRUCTION USA$6,250 / $0 / $6,250039539694X
Unpaid balance Default
DOCKETED · DEFAULTED
2025-04-30Dept. Of BuildingsJOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SECTIONPRIME CONSTRUCTION USA$5,000 / $0 / $5,000039539693Y
Unpaid balance Default
DOCKETED · DEFAULTED
2025-02-17Dept. Of BuildingsFAILED TO PROTECT ADJ. PROPERTYPRIME CONSTRUCTION USA$12,500 / $0 / $12,500039537052P
Unpaid balance Default
DOCKETED · DEFAULTED
2024-02-29Dept. Of BuildingsMISCELLANEOUS VIOLATIONSPRIME CONSTRUCTION USA$10,000 / $0 / $10,000039525998H
Unpaid balance
HEARING COMPLETED · IN VIOLATION
2024-01-13Dep - Bureau Of Env. CompliancFAIL TO KEEP HAVE AVAILABLE FOR INSPECTION NOISE MITIGATION PLANSUPREME BUILDERS CORP$440 / $0 / $572000602395J
Unpaid balance
DOCKETED · IN VIOLATION
2023-12-13Sanitation OthersFAILURE TO CLEAN 18 INCHES INTO STREET2918 ARNOW REAL ESTATE CORP$50 / $0 / $50048120149Y

Showing 12 of 90 records. The API and the source dataset have the full list.

Source: OATH Hearings Division Case Status — city dataset updated 2026-11-01; data as of 2026-11-01

HPD registration & contacts

Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.

No HPD registration found. Registration is required for buildings with 3 or more apartments (and for 1–2 family homes where neither the owner nor family lives there).

Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-10-28; data as of 2026-11-01; HPD Registration Contacts — city dataset updated 2026-10-28; data as of 2026-11-01

HPD housing-code violations 0 open of 0

Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-10-31; data as of 2026-11-01

HPD complaints 0

Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.

No records found in this dataset for this lot.

Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-01; data as of 2026-11-01

311 requests (last 12 months) 5

Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.

OpenedAgencyComplaintStatusClosed
2026-08-01DSNYIllegal Dumping – Removal RequestClosed2026-08-03
2026-05-06DSNYIllegal Dumping – Removal RequestClosed2026-05-09
2026-01-21NYPDIllegal Parking – Double Parked Blocking TrafficClosed2026-01-21
2026-01-21DSNYSnow or Ice – SidewalkClosed2026-01-22
2025-12-14DSNYSnow or Ice – SidewalkClosed2025-12-16

Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-01; data as of 2026-11-01

Nearby properties

On 3 Ave

Same tax block (3041)

All properties on 3 Ave, Bronx · All of Bronx 10458 (Belmont)

Open-item counts as of October 31, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs