2116 Colonial Avenue, Bronx, NY 10461
BBL 2042520007 (Borough 2, Block 4252, Lot 7) · BIN 2047827 · Last updated:
Summary · as of October 31, 2026
2116 Colonial Avenue (Bronx, NY 10461; tax lot BBL 2042520007) is a 16-unit elevator apartment building (building class D1: elevator apartments, semi-fireproof, no stores), built around 2020, on a 3,742 sq ft lot zoned R7-1. City tax records list the owner as 2116 COLONIAL LLC; the most recent deed with a stated price is dated March 8, 2017 at $535,000 (per ACRIS). The Department of Finance's final market value for tax year 2027 is $1,358,000. As of October 31, 2026, NYC Open Data shows four active DOB violations, one active ECB violation, 91 open HPD violations and six OATH tickets with an unpaid balance. There were 472 311 requests in the past 12 months and 213 HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)
- Owner of record
- 2116 COLONIAL LLC
- Building class
- D1 · Elevator apartments, semi-fireproof, no stores
- Year built · units
- 2020 · 16 res.
- Lot area · zoning
- 3,742 sq ft · R7-1
- Market value (DOF)
- $1,358,000 FY2027
- Last priced deed
- $535,000 · 2017-03-08
- BBL
- 2042520007
- BIN
- 2047827
- 0Open DOB jobs (permit issued, no sign-off)
- 4Active DOB violations
- 1Active ECB violations
- 91Open HPD violations
- 6OATH tickets with unpaid balance
How to cite: NYC Property Facts, “2116 Colonial Avenue, Bronx, NY 10461 (BBL 2042520007)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/bronx/2116-colonial-avenue-2042520007. Source: NYC Open Data.
Lot & building
Basic facts about the tax lot and building from the city’s PLUTO database.
- Owner (as listed by the city)
- 2116 COLONIAL LLCThe owner name on the city’s tax records. It can lag behind recent sales and is often an LLC.
- Building class
- D1 – Elevator apartments, semi-fireproof, no storesThe Department of Finance’s category for what kind of building this is.
- Land use
- Multi-family elevator buildingsCity Planning’s broad category of how the lot is used.
- Year built
- 2020Often an estimate for older buildings. Major alteration recorded: 2019.
- Floors
- 7
- Units
- 16 residential / 16 totalResidential units are apartments; total includes stores and offices.
- Buildings on lot
- 1
- Lot size
- 3,742 sq ft (37.42 ft × 100 ft)
- Building floor area
- 14,380 sq ft (incl. 880 sq ft commercial)
- Zoning
- R7-1The zoning district sets what can be built and used here. Residential district.
- Built vs. allowed density (FAR)
- 3.84 built / 3.44 max residentialFloor Area Ratio = building floor area ÷ lot area. If built FAR is below the maximum, zoning may allow more floor area (other rules apply).
- Identifiers
- BBL 2042520007 (Borough 2, Block 4252, Lot 7) · BIN 2047827BBL identifies the tax lot; BIN identifies each building (from DOB/HPD/footprint records).
Agency lookups: DOB BIS · ZoLa (zoning map) · ACRIS
Source: PLUTO (Dept. of City Planning) — city dataset updated 2026-08-24; data as of 2026-11-02; Building Footprints — city dataset updated 2026-10-25; data as of 2026-11-01
Tax assessment
How the Department of Finance values this lot for property tax.
- Market value (tax year 2027, final roll)
- $1,358,000The Department of Finance’s estimate of value for tax purposes. It is not an appraisal and is often far from the sale price.
- Assessed value
- $611,100The portion of market value that taxes are calculated on (capped by law for small homes).
- Taxable value (final)
- $611,100Assessed value minus any exemptions.
- Tax class
- Tax class 2 – residential, 4+ units
| Tax year | Roll | Market value | Assessed value | Tax class |
|---|---|---|---|---|
| 2027 | Final | $1,358,000 | $611,100 | 2 |
| 2026 | Final | $989,000 | $445,050 | 2 |
| 2025 | Final | $2,860,000 | $1,287,000 | 2 |
Source: DOF Property Valuation and Assessment Data — city dataset updated 2026-09-14; data as of 2026-11-02
Sales & deed history 6
Deeds recorded with the City Register (ACRIS). A deed transfers ownership. A $0 or very low price usually means a transfer between related parties, an estate, or a refinance-related transfer, not a market sale. This is not a title search; mortgages, liens and other documents are not shown.
| Date | Type | Price | Seller (grantor) | Buyer (grantee) | Doc ID |
|---|---|---|---|---|---|
| 2019-08-30 | DEED | $0 / not stated | Lumaj, Justina | 2116 Colonial Llc | 2019100200507001 |
| 2017-03-08 | DEED | $535,000 | The Maria C. Cacciato Irrevocable Trust; Marie Cacciato, Trustee | Lumaj, Justina | 2017031000822001 |
| 2016-12-08 | DEED | $0 / not stated | Cacciato, Maria C | The Maria C. Cacciato Irrevocable Trust; Marie Cacciato,Trustee | 2017012001041002 |
| 1995-06-02 | DEED | $0 / not stated | Bonomo, Elena; Bonomo, Angelo | Cacciato, Giuseppe; Cacciato, Maria C | FT_2480004761548 |
| 1980-06-25 | DEED | $0 / not stated | Balzano Salvatore; Balzano Ada | Elena Benomo; Angelo Benomo | BK_8020042100251 |
| 1974-01-29 | DEED | $0 / not stated | Wagner Mary | Ada Balzano; Salvatore Balzano | BK_7420023701124 |
Source: ACRIS Real Property Master — city dataset updated 2026-10-08; data as of 2026-11-02; ACRIS Real Property Legals — city dataset updated 2026-10-08; data as of 2026-11-02; ACRIS Real Property Parties — city dataset updated 2026-10-08; data as of 2026-11-02
DOB job filings 0 open of 11
A “job” is an application to the Department of Buildings to do construction work. A job marked Permitted, not signed off had a work permit issued but the city has no record of final sign-off (inspection/completion). Old jobs left in this state are common and appear in buyer and lender due diligence; the work may or may not have been done.
| Status | Job # | Type | Filed | Est. cost |
|---|---|---|---|---|
| Not open Approved · 2021-12-27 | X00386451-P1 DOB NOW | Alteration | 2021-12-24 | $8,000 |
| Not open Approved · 2021-12-27 | X00422117-P1 DOB NOW | Alteration | 2021-12-24 | $8,000 |
| Not open LOC Issued · 2021-12-10 | X00542821-I1 DOB NOW | Alteration | 2021-09-21 | $1,000 |
| Not open LOC Issued · 2021-12-28 | X00422117-I1 DOB NOW | Alteration | 2020-11-03 | $8,000 |
| Not open LOC Issued · 2021-12-28 | X00386451-I1 DOB NOW | Alteration | 2020-08-18 | $8,000 |
| Not open LOC Issued · 2021-09-13 | X00336547-I1 DOB NOW | Alteration | 2020-04-03 | $8,000 |
| Not open LOC Issued · 2021-09-13 | X00181197-I1 DOB NOW | Alteration | 2019-06-20 | $8,000 |
| Not open SIGNED OFF · 2021-12-10 | 220688192 BIS | A3 – Minor alteration (one type of work) | 2019-02-26 | — |
| Not open SIGNED OFF · 2022-01-04 | 220643695 BIS | A2 – Alteration with multiple work types (no change to use/occupancy) | 2018-08-30 | $1,000 |
| Not open SIGNED OFF · 2022-10-11 | 220647496 BIS | NB – New building | 2018-08-13 | — |
| Not open SIGNED OFF · 2018-10-31 | 220599458 BIS | DM – Demolition | 2017-06-05 | — |
Source: DOB NOW: Build – Job Application Filings — city dataset updated 2026-11-01; data as of 2026-11-02; DOB Job Application Filings (BIS) — city dataset updated 2026-10-30; data as of 2026-10-31
Work permits 15
Individual permits issued under DOB jobs (one job can have several permits, e.g. plumbing and construction). Permit expiration alone does not mean the job was completed or signed off.
| Issued | Expires | Job # | Work | Permit status |
|---|---|---|---|---|
| 2021-11-15 | 2022-11-15 | X00542821-I1 DOB NOW | Curb Cut CURB CUT FILED IN CONJUNCTION WITH NB #220647496 & BPP # 220688192 | Signed-off |
| 2020-12-11 | 2021-11-16 | X00336547-I1 DOB NOW | Construction Fence 8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER IN CONJUNCTION WITH NB #220647496. | Signed-off |
| 2020-11-18 | 2020-11-28 | X00336547-I1 DOB NOW | Construction Fence 8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER IN CONJUNCTION WITH NB #220647496. | Signed-off |
| 2020-11-16 | 2021-11-17 | 220647496 BIS | New building | ISSUED (renewal) |
| 2020-11-05 | 2021-11-05 | X00422117-I1 DOB NOW | Supported Scaffold ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING C | Signed-off |
| 2020-08-19 | 2021-08-19 | X00386451-I1 DOB NOW | Sidewalk Shed PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 | Signed-off |
| 2020-04-20 | 2020-11-28 | X00336547-I1 DOB NOW | Construction Fence 8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER IN CONJUNCTION WITH NB #220647496. | Signed-off |
| 2020-03-17 | 2020-11-17 | 220647496 BIS | New building | ISSUED (renewal) |
| 2020-03-16 | 2021-03-16 | 220647496 BIS | Plumbing / Plumbing | ISSUED (initial) |
| 2019-08-08 | 2020-08-07 | 220647496 BIS | New building | ISSUED (renewal) |
| 2019-08-07 | 2020-08-07 | X00181197-I1 DOB NOW | Construction Fence 8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER | Signed-off |
| 2019-07-17 | 2019-08-10 | 220647496 BIS | New building | RE-ISSUED (initial) |
Showing 12 of 15 records. The API and the source dataset have the full list.
Source: DOB NOW: Build – Approved Permits — city dataset updated 2026-11-02; data as of 2026-11-02; DOB Permit Issuance (BIS) — city dataset updated 2026-10-31; data as of 2026-10-31
DOB violations 4 active of 5
Violations issued by the Department of Buildings for building-code or zoning conditions. Active means DOB has not recorded the violation as resolved or dismissed. Many active DOB violations are old (e.g. elevator or boiler inspection paperwork).
| Status | Issued | Type | Description | Number |
|---|---|---|---|---|
| Active V-DOB VIOLATION - ACTIVE | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | V111425LBLVIO07073 |
| Active V-DOB VIOLATION - ACTIVE | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | V111425LBLVIO07072 |
| Active V-DOB VIOLATION - ACTIVE | 2023-04-25 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | V042523LBLVIO09831 |
| Active V-DOB VIOLATION - ACTIVE | 2023-04-25 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | V042523LBLVIO09830 |
| Resolved/dismissed V*-DOB VIOLATION - DISMISSED | 2020-09-02 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | V*090220AEUHAZ102634 |
Source: DOB Violations — city dataset updated 2026-11-02; data as of 2026-11-02
ECB violations (DOB) 1 active of 26
DOB violations that go to a hearing at OATH (formerly the Environmental Control Board) and can carry fines. Active or Resolved follows the DOB violation status field. The hearing status is about the hearing and its penalty: written off means the city stopped collecting the fine, not that the condition was corrected. A balance due is a fine the city says is unpaid.
| Status | Issued | Severity | What it was for | Penalty / paid / balance | ECB # |
|---|---|---|---|---|---|
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2019-07-25 | CLASS - 2 | 3309.11;PROSTECTION OF TREES AT TIME OF INSPECTION ON A PROPOSED 7 STORY BUILDING WHILE DRILLING OPERATIOBS WERE TAKING PLACE.OBSERVED AT EXPOSURE #1 AN UNPROTECTED TREE WITH MUD FROM JOBSITE ON | $625 / $625 / $0 | 35444234H |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2020-12-07 | CLASS - 2 | PERMIT EXPIRED FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE)ONSITE.NOTE:AT THE TIME OF INSPECITON OBSERVED A 7 STORY NEW BLDG UNDER CONSTRUCTION AT 7TH FLOOR LEVEL.ACTIVE JOBSITE WORKERS WORKING ON IT ALSO OBSERV | $0 / $0 / $0 | 35510483L |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2020-12-07 | CLASS - 2 | MISSING FENCE NOTE:AT THE TIME OF INSPECITON OBSERVED A 7 STORY NEW BUILDING UNDER CONSTRUCTION AT 7TH FLOOR LEVEL.ACTIVE JOBSITE,WORKERS WORKING ON IT.ALSO OBSERVED MISSING CONSTRUCTION FENCE AT EXPOSURE THREE | $0 / $0 / $0 | 35510480X |
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2020-12-07 | CLASS - 1 | BC 3314.1 FAILURE TO MAINTAIN PIPE SCAFFOLDING NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY NEW BUILDING UNDER CONSTRUCTION AT 7TH FLOOR LEVEL.ACTIVE JOBSITE,WORKERS WORKING ON IT ALSO OBSERVED A PIPE SCAF | $2,500 / $2,500 / $0 | 35510482J |
| Resolved Hearing: ADMIT/IN-VIO · Certification: CERTIFICATE ACCEPTED | 2021-02-22 | CLASS - 2 | NOTIFICATION OF ADJUSTABLE SUSPENDED SCAFFOLD INSTALLATION NOTE:@TIME OF INSP OBSERVED 7STYNB UNDER CONST@ROOF LEVEL.ACTIVE JOBSITE,WORKERS WORKING ON IT.ALSO OBSERVED ADJUSTABLE SUSPENDED SCAFFOLD@EXP2&4 W/OUT | $2,530 / $2,530 / $0 | 35543976K |
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2021-02-13 | CLASS - 2 | FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO &/OR EXPOSE ON GOING CONSTRUCTION OR WORK ON AN ACTIVE & PERMITTED WORKSITE. NOTE: AT THE TIME OF INSPECTION OBSERVED FROM FENCE WINDOW 1 WORKER WALKING | $1,250 / $1,266 / $0 | 35544517X |
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2019-07-25 | CLASS - 1 | 301.13.1:SITE SAFETY PLAN AT TIME OF INSPECTION ON A PROPOSED 7 STORY NEW BUILDING OBSERVED VIOLATING CONDITION UPON ENTERING THE SITE NOTED OBSTRUCTED OF SIDEWALK (PEDESTRIAN PATHWAY ) HOSE CONNECTED TO FIRE | $2,500 / $2,500 / $0 | 35444232Y |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2019-11-14 | CLASS - 2 | 3303.14.2DRAINAGE OF EXCAVATION.@ TIME OF INSP OBSERVED CONST SITE WASPERFORM EXCAVATION PHASE DURING INSPECTION NOTED THERE WAS A LOT WATERNOT BE REMOVED.THIS SECTION (ALL EXCAVATION SHALL BE DRAINED &THE DRAW | $0 / $0 / $0 | 35457235M |
| Resolved Hearing: IN VIOLATION · Certification: CERTIFICATE ACCEPTED | 2020-12-07 | CLASS - 1 | HOUSEKEEPING NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY NEW BUILDING UNDER CONSTRUCTION AT 7TH FLOOR LEVEL.ACTIVE JOBSITE,WORKERS WORKING ON IT.ALSO OBSERVED INADEQUATE HOUSEKEEPING ENTIRE JOBSITE.OBSERV | $2,500 / $2,500 / $0 | 35510479Z |
| Resolved Hearing: DEFAULT · Certification: CERTIFICATE ACCEPTED | 2020-02-13 | CLASS - 2 | FAILED TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A COC WITH DOB AT TIME OF INSPECTION,FOUND JOBSITE CLOSED AND INACTIVE.UPON REVIEW OF THEBIS FOR THIS SITE I FOUND VIOLATION#35457235M HAD A COC PACKAGE SUBMIT | $3,125 / $3,181 / $0 | 35471407K |
| Active Hearing: IN VIOLATION · Certification: NO COMPLIANCE RECORDED | 2025-04-08 | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #919573. REMEDY: SUBMIT ACCEPTABLE REQU | $2,500 / $2,591 / $0 | 37035165Z |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2020-10-09 | CLASS - 2 | THE EXTERIOR CMU WALLS ON EXPOSURE #1,#2,#3 & #4 FROM 1ST. TO 4TH. FLOOR WERE INSTALLED WITH 0.5" SPACE BETWEEN CMU WALLS & METAL STUDS CONTRARY TO 1" SPACE FOR CONTINUAL INSULATION BETWEEN CMU WALLS & METAL ST | $0 / $0 / $0 | 39030166K |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2021-04-08 | CLASS - 2 | BC3307.4.7 OPEN DEBRIS CONTAINER@STORAGE ZONES.NOTE:ATOI OBSERVED 7STYBLDG UNDER CONST@ROOF LEVEL;IN ACTIVE JOBSITE.OBSERVED METAL DEBRIS CONTAINER FULL OF DEBRIS IN IT ON STREET CLOSE TO SIDEWALK IN FRONT OF C | $0 / $0 / $0 | 35551509L |
| Resolved Hearing: CURED/IN-VIO · Certification: CURE ACCEPTED | 2021-01-05 | CLASS - 2 | BC 3307.2.3 FAILURE TO PROVIDE DEBRIS NETTING.UPON INSPECTION THEIR WAS AN APPROX. GAP OF 30" FROM THE TOP OF THE CONSTRUCTION FENCE TO THE UNPERSIDE OF THE SIDEWALK SHED BRIDGE.THE CODE STIPULATES THAT DEBRIS | $0 / $0 / $0 | 35544864K |
| Resolved Hearing: ADMIT/IN-VIO · Certification: CERTIFICATE ACCEPTED | 2021-02-22 | CLASS - 1 | INADEQUATE HOUSEKEEPING NOTE:@TIME OF INSP OBSERVED 7STYNB UNDER CONST@ROOF LEVEL.ACTIVE JOBSITE,WORKERS WORKING ON IT.ALSO OBSERVED PILES OF DEBRIS W/BLACK BAGS,DISCARDED WOODS,PLYWOODS@REARYD,CREATING FIRE HA | $2,530 / $2,530 / $0 | 35543978Y |
Showing 15 of 26 records. The API and the source dataset have the full list.
Source: DOB ECB Violations — city dataset updated 2026-10-31; data as of 2026-11-02
OATH tickets (all agencies) 6 unpaid of 39
Summonses heard at the Office of Administrative Trials and Hearings, from agencies like Sanitation, Buildings, Fire and Health, linked to this lot’s block and lot. Default means the respondent did not appear at the hearing, which typically results in the maximum penalty. Tickets may be issued to tenants or businesses at the address, not just the owner. DOB ECB tickets appear here too.
| Status | Date | Agency | Charge | Respondent | Imposed / paid / balance | Ticket # |
|---|---|---|---|---|---|---|
| Unpaid balance Default DOCKETED · DEFAULTED | 2024-07-25 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $5,000 / $0 / $5,000 | 012157113P |
| Unpaid balance Default DOCKETED · DEFAULTED | 2024-06-18 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $5,000 / $0 / $5,000 | 012152451P |
| Unpaid balance Default DOCKETED · DEFAULTED | 2024-04-25 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $5,000 / $0 / $5,000 | 012149885P |
| Unpaid balance Default DOCKETED · DEFAULTED | 2024-03-29 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $5,000 / $0 / $5,000 | 012148826K |
| Unpaid balance Default DOCKETED · DEFAULTED | 2023-12-21 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $1,000 / $0 / $1,000 | 012145199R |
| Unpaid balance Default DOCKETED · DEFAULTED | 2022-10-18 | Dos - Enforcement Agents | LOOSE RUBBISH 1ST OCCURRENCE | 2116 COLONIAL LLC | $300 / $0 / $300 | 047638881P |
| No balance due PAID IN FULL · IN VIOLATION | 2025-04-08 | Dept. Of Buildings | FAILURE TO SUBMIT REQUIRED REPORT OF CRITICAL EXAMINATION | 2116 COLONIAL LLC | $2,500 / $2,591 / $0 | 037035165Z |
| No balance due PAID IN FULL | 2023-03-27 | Sanitation Others | FAILURE TO PROPERLY PUT RECYCS OUT FOR COLLECTION 1TO8DWELLING UNITS | 2116 COLONIAL LLC | $25 / $25 / $0 | 047271977L |
| No balance due PAID IN FULL · IN VIOLATION | 2022-07-29 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $375 / $382 / $0 | 012124602P |
| No balance due HEARING COMPLETED · IN VIOLATION | 2022-01-11 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $935 / $5,000 / $-4,065 | 012117257H |
| No balance due Default PAID IN FULL · DEFAULTED | 2021-11-02 | Fire Department Of Nyc | FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS | 2116 COLONIAL LLC | $1,000 / $1,003 / $0 | 012115136M |
| No balance due HEARING COMPLETED · IN VIOLATION | 2021-04-08 | Dept. Of Buildings | MISCELLANEOUS VIOLATIONS | DEDAJ CONSTRUCTION CORP | $0 / $0 / $0 | 035551509L |
Showing 12 of 39 records. The API and the source dataset have the full list.
Source: OATH Hearings Division Case Status — city dataset updated 2026-11-02; data as of 2026-11-02
HPD registration & contacts
Owners of most rental buildings must register with the Department of Housing Preservation and Development each year and list an owner and managing agent.
- HPD building ID
- 1005007
- Last registered
- 2026-09-02
- Registration valid until
- 2027-09-01 CurrentRegistrations must be renewed every year.
| Role | Name | Company | Business city |
|---|---|---|---|
| Corporateowner | 2116 Colonial LLC | New York, Ny | |
| Officer | Fred Lumaj | New York, Ny | |
| Shareholder | Fred Lumaj | New York, Ny | |
| Headofficer | Fred Lumaj | New York, Ny | |
| Sitemanager | Roland Gjergji | ||
| Agent | Roland Nezaj | RLN Management Services Inc | New York, Ny |
Source: HPD Multiple Dwelling Registrations — city dataset updated 2026-10-28; data as of 2026-11-02; HPD Registration Contacts — city dataset updated 2026-10-28; data as of 2026-11-02
HPD housing-code violations 91 open of 183
Violations HPD inspectors issued for conditions in residential buildings (heat, leaks, mold, pests, lead paint, etc.). Class letters show how serious: Class A – non-hazardous (HPD gives 90 days to correct); Class B – hazardous (30 days to correct); Class C – immediately hazardous (24 hours to correct for most conditions); Class I – information / order (e.g. orders to register, lead or other administrative orders). Open means HPD has not recorded the condition as corrected.
| Status | Class | Issued | Apt | Condition |
|---|---|---|---|---|
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 6C | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STO |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 3A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASECABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 3A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR TO THE PANEL AT NORTH WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 3A | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STO |
| Open Nov Sent Out · 2026-09-16 | C | 2026-09-16 | 3A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 6C | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 3A | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY |
| Open Nov Sent Out · 2026-09-16 | B | 2026-09-16 | 3A | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-27 | B | 2026-07-27 | 3A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | C | 2026-07-02 | 3A | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOODEN FLOOR TILES (CREATING A CUT HAZARD) IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SPRINKLER HEAD COVER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | A | 2026-07-02 | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AT PUBLIC HALL, 3rd STORY | |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EHAUST AT RANGE IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE UPPER WALL HUNG CABINET IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY |
| Open Nov Sent Out · 2026-07-02 | B | 2026-07-02 | 3A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
Showing 20 of 183 records — open violations are listed first; the API lists every one. The API and the source dataset have the full list.
Source: HPD Housing Maintenance Code Violations — city dataset updated 2026-11-02; data as of 2026-11-02
HPD complaints 213
Complaints tenants or others made to HPD (usually via 311) about housing conditions, from 2019 onward. A complaint is not a violation; HPD may inspect and issue one.
| Received | Status | Apt | Problem(s) | Outcome |
|---|---|---|---|---|
| 2026-09-09 | CLOSE | 3A | Unsanitary Condition – Pests General – Bell/Buzzer/Intercom Unsanitary Condition – Garbage/Recycling Storage | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-09-09 | CLOSE | 3A | Unsanitary Condition – Pests Flooring/Stairs – Floor Unsanitary Condition – Mold General – Cabinet Safety – Smoke Detector Water Leak – Slow Leak Plumbing – Basin/Sink Door/Window – Window Pane | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-08-27 | CLOSE | 6C | Unsanitary Condition – Pests | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-08-27 | CLOSE | 6C | Unsanitary Condition – Garbage/Recycling Storage Unsanitary Condition – Pests | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-08-17 | CLOSE | 6C | Unsanitary Condition – Pests | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-06-22 | CLOSE | 3A | Unsanitary Condition – Pests | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-06-22 | CLOSE | 3A | Water Leak – Slow Leak Flooring/Stairs – Floor General – Cabinet Unsanitary Condition – Pests Unsanitary Condition – Mold Electric – Lighting | HPD inspected this condition so the complaint has been closed. Violations were issued. The law provides the property owner time to correct the condition(s). Violation descriptions and the dates for t |
| 2026-05-10 | CLOSE | 3A | Unsanitary Condition – Pests | HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. |
| 2026-05-10 | CLOSE | 3A | Unsanitary Condition – Pests Flooring/Stairs – Floor Paint/Plaster – Ceiling Unsanitary Condition – Mold | HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more in |
| 2026-04-09 | CLOSE | 3A | Paint/Plaster – Wall | An HPD Inspector was not able to gain access to inspect this complaint. The Inspector left a card at the time of the inspection and a letter was sent from HPD after the inspection attempt to encourage |
Showing 10 of 213 records. The API and the source dataset have the full list.
Source: HPD Housing Maintenance Code Complaints and Problems — city dataset updated 2026-11-02; data as of 2026-11-02
311 requests (last 12 months) 472
Recent 311 service requests the city geocoded to this lot: noise, illegal parking, heat, sanitation and more. Anyone can file them, so they describe activity at or near the address, not necessarily the building itself.
| Opened | Agency | Complaint | Status | Closed |
|---|---|---|---|---|
| 2026-09-09 | HPD | UNSANITARY CONDITION – PESTS | Closed | 2026-09-15 |
| 2026-09-09 | HPD | GENERAL – BELL/BUZZER/INTERCOM | Closed | 2026-09-15 |
| 2026-09-09 | HPD | UNSANITARY CONDITION – GARBAGE/RECYCLING STORAGE | Closed | 2026-09-15 |
| 2026-09-09 | HPD | WATER LEAK – SLOW LEAK | Closed | 2026-09-15 |
| 2026-09-09 | HPD | DOOR/WINDOW – WINDOW PANE | Closed | 2026-09-15 |
| 2026-09-09 | HPD | SAFETY – SMOKE DETECTOR | Closed | 2026-09-15 |
| 2026-09-09 | HPD | UNSANITARY CONDITION – PESTS | Closed | 2026-09-15 |
| 2026-09-09 | HPD | PLUMBING – BASIN/SINK | Closed | 2026-09-15 |
| 2026-09-09 | HPD | FLOORING/STAIRS – FLOOR | Closed | 2026-09-15 |
| 2026-09-09 | HPD | UNSANITARY CONDITION – MOLD | Closed | 2026-09-15 |
Showing 10 of 472 records. The API and the source dataset have the full list.
Source: 311 Service Requests from 2020 to Present — city dataset updated 2026-11-02; data as of 2026-11-02
Nearby properties
On Colonial Ave
- 2115 Colonial Avenue
- 2119 Colonial Avenue
- 2112 Colonial Avenue
- 2121 Colonial Avenue (one open item)
- 2111 Colonial Avenue
- 2123 Colonial Avenue
- 2108 Colonial Avenue (one open item)
- 2125 Colonial Avenue
- 2106 Colonial Avenue
- 2126 Colonial Avenue (one open item)
Same tax block (4252)
- 2100 Colonial Avenue (71 open items)
- 2102 Colonial Avenue (eight open items)
- 2106 Colonial Avenue
- 2108 Colonial Avenue (one open item)
- 2112 Colonial Avenue
- 2126 Colonial Avenue (one open item)
- 1910 Pelham Parkway South (34 open items)
- 2115 Burr Avenue (one open item)
- 2105 Burr Avenue (18 open items)
All properties on Colonial Ave, Bronx · All of Bronx 10461 (Morris Park)
Open-item counts as of October 31, 2026; each section lists its own dataset date. Machine-readable: JSON API · Markdown · Plain text · API & MCP docs