# 45-02 Ditmars Boulevard, Queens, NY 11105

BBL 4007697501 · Block 769 · Lot 7501 · BIN 4014554, 4531477  
Canonical page: https://nycpropertyfacts.com/ny/queens/45-02-ditmars-boulevard-4007697501  
Last updated: 2026-10-31 · Open-item counts as of 2026-10-31

Also recorded as: 45-02-45-24 Ditmars Blvd

## Summary

45-02 Ditmars Boulevard (Queens, NY 11105; tax lot BBL 4007697501) is a 201-unit condominium (building class RM: condominium (subtype RM)), built around 1900, on a 71,934 sq ft lot zoned R6A. City tax records list the owner as UNAVAILABLE OWNER. As of October 31, 2026, NYC Open Data shows four DOB jobs with a permit issued but no sign-off, 37 active DOB violations, 14 active ECB violations, 19 open HPD violations and 12 OATH tickets with an unpaid balance. There were 21 311 requests in the past 12 months and 19 HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “45-02 Ditmars Boulevard, Queens, NY 11105 (BBL 4007697501)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/queens/45-02-ditmars-boulevard-4007697501. Source: NYC Open Data.

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 4 |
| Active DOB violations | 37 |
| Active ECB violations | 14 |
| Open HPD violations | 19 |
| OATH tickets with unpaid balance | 12 |

## Lot & building

- Owner of record: UNAVAILABLE OWNER
- Building class: RM – Condominium (subtype RM)
- Year built: 1900
- Floors: —
- Units: 201 residential / 204 total
- Lot area: 71,934 sq ft · Building area: 234,260 sq ft
- Zoning: R6A
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), data as of 2026-11-01

## Tax assessment

- Tax year 2027 (final roll): market value $0, assessed value $0, tax class 2
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

No records found.

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | open (Permit Entire) | DOB NOW job filing Q01342809-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-05-13 | open (Permit Entire) | DOB NOW job filing Q01224375-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-01-31 | open (Permit Entire) | DOB NOW job filing Q01174085-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2024-08-22 | open (Permit Entire) | DOB NOW job filing Q01098018-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2026-10-21 | n/a (Permit Issued) | DOB NOW work permit for job Q01342809-I1: General Construction — APPLICATION BEING FILED FOR BUILDING FACADE REPAIRS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.. Issued 2026-10-21, expires 2027-02-20. | rbx6-tga4 |
| 2026-09-28 | n/a (Permit Issued) | DOB NOW work permit for job Q01174085-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2026-09-28, expires 2026-12-27. | rbx6-tga4 |
| 2026-08-21 | n/a (Permit Issued) | DOB NOW work permit for job Q01098018-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2026-08-21, expires 2026-11-19. | rbx6-tga4 |
| 2026-06-29 | n/a (Permit Issued) | DOB NOW work permit for job Q01174085-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2026-06-29, expires 2026-09-27. | rbx6-tga4 |
| 2026-03-04 | n/a (Permit Issued) | DOB NOW work permit for job Q01174085-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2026-03-04, expires 2026-06-02. | rbx6-tga4 |
| 2025-10-02 | n/a (Permit Issued) | DOB NOW work permit for job Q01224375-I1: Suspended Scaffold — FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. Issued 2025-10-02, expires 2026-10-02. | rbx6-tga4 |
| 2025-09-18 | n/a (Signed-off) | DOB NOW work permit for job Q01216526-I1: General Construction — DECORATIVE EIFS REMOVAL/ RESCURING TO ADDRESS DOB VIOLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.. Issued 2025-09-18, expires 2026-03-31. | rbx6-tga4 |
| 2025-08-19 | n/a (Permit Issued) | DOB NOW work permit for job Q01098018-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2025-08-19, expires 2026-08-19. | rbx6-tga4 |
| 2025-05-19 | n/a (Permit Issued) | DOB NOW work permit for job Q01224375-I1: Suspended Scaffold — FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. Issued 2025-05-19, expires 2025-09-27. | rbx6-tga4 |
| 2025-01-31 | n/a (Permit Issued) | DOB NOW work permit for job Q01174085-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2025-01-31, expires 2026-01-31. | rbx6-tga4 |
| 2024-08-22 | n/a (Permit Issued) | DOB NOW work permit for job Q01098018-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE…. Issued 2024-08-22, expires 2025-08-22. | rbx6-tga4 |
| 2022-01-28 | n/a (Signed-off) | DOB NOW work permit for job Q00606450-I1: Boiler Equipment — REPLACE THREE GAS BOILERS IN KIND.. Issued 2022-01-28, expires 2022-12-31. | rbx6-tga4 |
| 2022-01-28 | n/a (Signed-off) | DOB NOW work permit for job Q00606415-I1: Plumbing — CONNECT REPLACEMENT BOILERS TO EXISTING GAS PIPING.. Issued 2022-01-28, expires 2022-12-31. | rbx6-tga4 |
| 2021-11-10 | n/a (Signed-off) | DOB NOW work permit for job Q00606415-I1: Plumbing — CONNECT REPLACEMENT BOILERS TO EXISTING GAS PIPING.. Issued 2021-11-10, expires 2022-01-22. | rbx6-tga4 |
| 2021-11-05 | n/a (Signed-off) | DOB NOW work permit for job Q00606450-I1: Boiler Equipment — REPLACE THREE GAS BOILERS IN KIND.. Issued 2021-11-05, expires 2022-01-22. | rbx6-tga4 |
| 2015-08-14 | n/a (ISSUED (initial)) | BIS work permit for job 421044024: Alteration / Other / general construction. Issued 2015-08-14, expires 2015-10-04. | ipu4-2q9a |

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-03-17 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (C-CONSTRUCTION OTHER OPTIONAL): EMERGENCY WORK ORDER. DEFLECTED DECORATING EIFS WINDOW CORNICE, SPALLE & DEFECTED DECORATIVE EIFS PIER @ ELEVATION @ SEVERAL LOCATIONS REMEDY:IMMEDIATELY REMOVED ALL FAILED/LOOSE DECORATIVE EIFS WINDOW CORNICE & PIER AND REPAIR ALL DEFECTI…. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-02-19 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED): CYCLE 9A UNSAFE REPORT FILED. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-08-13 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (C-CONSTRUCTION OTHER OPTIONAL): EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED AT EXP 1 WEST ELEVATION OBSERVED CRACKED/SPALLING BRICKS AT MULTIPLE LOCATION. ALSO LOOSE MATERIAL AT THE CHIMNEY. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURE AT EXP 3 (COURTYARD) TO SEC…. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-08-13 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (C-CONSTRUCTION OTHER OPTIONAL): EMERGENCY WORK ORDER.OBSERVED AT EXP3 WEST ELEVATION,CRACKED BRICKS AT MULTIPLE LOCATIONS.ALSO LOOSE MATERIALS.REMEDY:IMMEDIATELY PROVIDE SA FETY MEASURES(COURTYARD)TO SECURE/PROTECT THE PUBLIC AND REPAIR LOOSE MATERIALS. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2022-02-22 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED): FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-01-22 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISP-FACADE SAFETY PROGRAM FACADE REQUIRED). Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2018-05-31 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED): FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2015-10-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2013-06-03 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (BENCH-FAILURE TO BENCHMARK NONE): FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2012-05-03 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (BENCH-FAILURE TO BENCHMARK NONE): FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2012-01-01 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (BENCH-FAILURE TO BENCHMARK NONE): FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-01-16 | open (violation status ACTIVE; hearing status IN VIOLATION; certification NO COMPLIANCE RECORDED) | ECB (DOB) violation, class - 2: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #814636.AGG1:PRIOR NOV 37022315M UNDER 28-302.5. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: found in violation. Certification of correction: no compliance recorded. | 6bgk-3dad |
| 2024-08-13 | open (violation status ACTIVE; hearing status IN VIOLATION; certification NO COMPLIANCE RECORDED) | ECB (DOB) violation, class - 1: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ATTHE TIME OF INSPECTION OBSERVED AT EXP#3 COURTYARD CRACKED/SPALLING BRICKS AT MULTIPLE LOCATION.ALSO LOOSE MATERIALS AT THE CHIMNEY.REM:MAIN. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: found in violation. Certification of correction: no compliance recorded. | 6bgk-3dad |
| 2025-07-01 | open (violation status ACTIVE; hearing status IN VIOLATION; certification NO COMPLIANCE RECORDED) | ECB (DOB) violation, class - 2: FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000076595Y0005 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: found in violation. Certification of correction: no compliance recorded. Balance due $312. | 6bgk-3dad |

Showing 40 of 70. Full list: https://nycpropertyfacts.com/api/v1/property/4007697501/violations

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-07-27 | open (DEFAULTED · DEFAULTED) | OATH ticket from Dept. Of Buildings: PEDESTRAIN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. Unpaid balance $2,430. Respondent defaulted (did not appear). | jz4z-kudi |
| 2025-07-01 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAILURE TO FILE COMPLETE BOILER INSPECTION REPORT. Unpaid balance $312. | jz4z-kudi |
| 2025-07-01 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAILURE TO FILE COMPLETE BOILER INSPECTION REPORT. Unpaid balance $312. | jz4z-kudi |
| 2024-12-04 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Pcs - Dohmh: FAIL TO ELIMINATE CONDITIONS CONDUCIVE TO RODENT-DEBRIS,VEGETATION 1ST. Unpaid balance $300. | jz4z-kudi |
| 2024-12-04 | open (DOCKETED · IN VIOLATION) | OATH ticket from Fire Department Of Nyc: FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS. Unpaid balance $375. | jz4z-kudi |
| 2024-10-05 | open (DOCKETED · IN VIOLATION) | OATH ticket from Fire Department Of Nyc: PORTABLE FIRE EXTINGUISHERS AND FIRE HOSES. Unpaid balance $600. | jz4z-kudi |
| 2024-09-07 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: IMPROPER DISPOSAL - 1ST OFFENSE. Unpaid balance $75. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-08-13 | open (DOCKETED · DEFAULTED) | OATH ticket from Dept. Of Buildings: MISCELLANEOUS VIOLATIONS. Unpaid balance $12,500. Respondent defaulted (did not appear). | jz4z-kudi |
| 2022-12-30 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAILURE TO MAINTAIN ELEVATOR OR CONVEYING SYSTEM. Unpaid balance $1,250. | jz4z-kudi |
| 2022-12-13 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Pcs - Dohmh: FAIL TO ELIMINATE RODENT INFESTATION SHOWN BY ACTIVE RODENT SIGNS 1ST. Unpaid balance $300. | jz4z-kudi |
| 2020-11-12 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: UNREGISTERED BOILER OR WATER HEATER-350,000-4,200,000 BTU HR 1ST OFF. Unpaid balance $520. | jz4z-kudi |
| 2020-11-12 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: UNREGISTERED BOILER OR WATER HEATER-350,000-4,200,000 BTU HR 1ST OFF. Unpaid balance $520. | jz4z-kudi |
| 2026-10-13 | pending (NEW ISSUANCE) | OATH ticket from Fire Department Of Nyc: FIRE PROTECTION SYSTEMS:FAIL TO PREVENT UNNECESSARY UNWARRANTED ALARMS. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: MINIMUM DAILY WATER QUALITY MEASUREMENTS NOT TAKEN OR RECORDED 1ST. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: COMPL INSPEC NOT CONDUCT,DOC D ONCE EVERY 90 DAYS WHEN TOWER IN USE1ST. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: FAIL TO COLLECT ANALYZE RECORD WEEKLY BIO PROCESS CONTROL INDICATORS 1. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: LEGIONELLA SAMP NOT COLLECT ANALYZE RESULTS NOT RECD REPORT TO DEPT 1. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: NO RECORDS OF ALL CHEMICALS AND BIOCIDES ADDED 1ST. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: IMPROPER OR INADEQUATE STARTUP PROCEDURES 1ST. Hearing pending. | jz4z-kudi |
| 2026-06-18 | pending (RESCHEDULED) | OATH ticket from Cooling Towers - Dohmh: TWICE YEARLY OR OTHER REQUIRED CLEANING NOT CONDUCTED OR DOCUMENTED1ST. Hearing pending. | jz4z-kudi |

Showing 20 of 23. Full list: https://nycpropertyfacts.com/api/v1/property/4007697501/hearings

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-10-20 | closed (CLOSE) | HPD complaint (apt BLDG): Heat/Hot Water – Entire Building. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2026-02-23 | closed (CLOSE) | HPD complaint (apt 536): Heat/Hot Water – Apartment Only; Paint/Plaster – Ceiling. HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. | ygpa-z7cr |
| 2026-01-30 | closed (CLOSE) | HPD complaint (apt 139): Heat/Hot Water – Apartment Only. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2026-01-27 | closed (CLOSE) | HPD complaint (apt 524): Heat/Hot Water – Apartment Only; Door/Window – Window Pane. HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. | ygpa-z7cr |
| 2026-01-21 | closed (CLOSE) | HPD complaint (apt 418): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2026-01-06 | closed (CLOSE) | HPD complaint (apt 506): Plumbing – Radiator; Heat/Hot Water – Apartment Only. HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more i… | ygpa-z7cr |
| 2025-12-15 | closed (CLOSE) | HPD complaint (apt BLDG): Heat/Hot Water – Entire Building. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2025-03-27 | closed (CLOSE) | HPD complaint (apt 409): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2025-03-23 | closed (CLOSE) | HPD complaint (apt BLDG): Unsanitary Condition – Garbage/Recycling Storage. HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. | ygpa-z7cr |
| 2025-02-19 | closed (CLOSE) | HPD complaint (apt 308): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2025-01-09 | closed (CLOSE) | HPD complaint (apt 511): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2024-07-23 | closed (CLOSE) | HPD complaint (apt 416): Water Leak – Slow Leak. The Department of Housing Preservation and Development inspected the following conditions. Violations were issued. Information about specific violations is available at www.nyc.gov/hpd | ygpa-z7cr |
| 2024-05-08 | closed (CLOSE) | HPD complaint (apt 506): Paint/Plaster – Ceiling; Water Leak – Heavy Flow; Electric – Lighting; Unsanitary Condition – Mold; Appliance – Refrigerator. The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed. | ygpa-z7cr |
| 2024-04-03 | closed (CLOSE) | HPD complaint (apt 416): Water Leak – Slow Leak. The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new… | ygpa-z7cr |
| 2023-09-05 | closed (CLOSE) | HPD complaint (apt 111): Plumbing – Water Supply. The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed. | ygpa-z7cr |

Showing 15 of 40. Full list: https://nycpropertyfacts.com/api/v1/property/4007697501/complaints

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as UNAVAILABLE OWNER. | 64uk-42ks |
| 2026-09-01 | current_registration | HPD registration contact: Agent Michael Pistilli (LIDIA MANAGEMENT CORP.), business city Whitestone. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: HeadOfficer Anthony Pistilli, business city Whitestone. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: SiteManager Mark Ramaj. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: CorporateOwner (TEX DEVELOPMENT CO, LLC), business city Whitestone. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: Shareholder Joseph Pistilli, business city Whitestone. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: Officer Michael Pistilli, business city Whitestone. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: Shareholder Anthony Pistilli, business city Astoria. | feu5-w2e2 |
| 2026-09-01 | current_registration | HPD registration contact: Shareholder Anthony Pistilli, business city Whitestone. | feu5-w2e2 |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/4007697501