# 554 8th Avenue, Manhattan, NY 10018

BBL 1007870084 · Block 787 · Lot 84 · BIN 1014469  
Canonical page: https://nycpropertyfacts.com/ny/manhattan/554-8th-avenue-1007870084  
Last updated: 2026-11-07 · Open-item counts as of 2026-11-08

Also recorded as: 270 W 38 St; 270 W 38 Stree; 556 8 Ave; 270 W 38 Str; 270 8 Ave

## Summary

554 8th Avenue (Manhattan, NY 10018; tax lot BBL 1007870084) is a factory or industrial building (building class F9: factory / industrial building (subtype F9)), built around 1924, on a 13,166 sq ft lot zoned M1-9A. City tax records list the owner as 270 REALTY LLC. The Department of Finance's final market value for tax year 2027 is $70,999,000. As of November 8, 2026, NYC Open Data shows 43 DOB jobs with a permit issued but no sign-off, 66 active DOB violations and 18 OATH tickets with an unpaid balance. There were three 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “554 8th Avenue, Manhattan, NY 10018 (BBL 1007870084)”, data as of 2026-11-08, https://nycpropertyfacts.com/ny/manhattan/554-8th-avenue-1007870084. Source: NYC Open Data.

## Neighborhood

Midtown-Times Square: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square

- Open HPD violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square/open-hpd-violations
- Active DOB violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square/active-dob-violations
- Active ECB violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square/active-ecb-violations
- Open DOB jobs: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square/open-dob-jobs
- Unpaid OATH tickets: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/midtown-times-square/unpaid-oath-tickets

## ZIP

Manhattan 10018: https://nycpropertyfacts.com/ny/manhattan/10018

## Nearby properties

Ordered by map distance among lots on this street within 40 house numbers and on this tax block within 15 lot numbers.

- 540 8th Avenue (104 ft): https://nycpropertyfacts.com/ny/manhattan/540-8th-avenue-1007870001
- 570 8th Avenue (131 ft): https://nycpropertyfacts.com/ny/manhattan/570-8th-avenue-1007880001
- 580 8th Avenue (178 ft): https://nycpropertyfacts.com/ny/manhattan/580-8th-avenue-1007880004
- 557 8th Avenue (216 ft): https://nycpropertyfacts.com/ny/manhattan/557-8th-avenue-1007610039
- 545 8th Avenue (222 ft): https://nycpropertyfacts.com/ny/manhattan/545-8th-avenue-1007610033
- 584 8th Avenue (230 ft): https://nycpropertyfacts.com/ny/manhattan/584-8th-avenue-1007880008
- 262 West 38th Street (102 ft): https://nycpropertyfacts.com/ny/manhattan/262-west-38th-street-1007870076
- 256 West 38th Street (171 ft): https://nycpropertyfacts.com/ny/manhattan/256-west-38th-street-1007870072

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 43 |
| Active DOB violations | 66 |
| Active ECB violations | 0 |
| Open HPD violations | 0 |
| OATH tickets with unpaid balance | 18 |

## Lot & building

- Owner of record: 270 REALTY LLC
- Building class: F9 – Factory / industrial building (subtype F9)
- Year built: 1924
- Floors: 21
- Units: 0 residential / 67 total
- Lot area: 13,166 sq ft · Building area: 255,696 sq ft
- Zoning: M1-9A, MSX
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), city dataset updated 2026-08-24; last loaded 2026-11-08

## Tax assessment

- Tax year 2027 (final roll): market value $70,999,000, assessed value $31,949,550, tax class 4
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

| Date | Status | Description | Source |
|---|---|---|---|
| 1997-12-15 | recorded (DEED) | DEED dated 1997-12-15 from MELOHN, JOHNY to 270 REALTY LLC., no price stated ($0). | bnx9-e6tj |
| 1980-12-09 | recorded (DEED) | DEED dated 1980-12-09 from RELMAR OPERATING CORP to MELOHN, JOHNY, no price stated ($0). | bnx9-e6tj |

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2017-11-21 | open (Permit Entire) | DOB NOW job filing M00001755-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2020-06-12 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 140911556 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. HEREWITH FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH ELEVATOR MODERNIZATION PROJECT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | ic3t-wcy2 |
| 2019-04-09 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 123835056 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING IN 16TH FLOOR PRE-BUILT SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. | ic3t-wcy2 |
| 2019-04-01 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 123862828 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALLATION AND RENOVATION OF PARTITIONS, CEILINGS AND DOORS ON 16TH FLOOR PRE-BUILT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | ic3t-wcy2 |
| 2019-03-27 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 123849620 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. APPLICATION FILED FOR REPLACING WINDOWS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | ic3t-wcy2 |
| 2017-04-10 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 123045622 (A1 – Major alteration (changes use, egress or occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. DEMOLISH AND CONSTRUCT PARTITONS, CEILINGS, DOORS AND STAIRS AT CELLAR AND 1ST FLOOR TO CHANGE USE FROM STORAGE TO RETAIL AS SHOWN ON DRAWINGS FILED HEREWIT H. | ic3t-wcy2 |
| 2013-11-26 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 121854920 (A3 – Minor alteration (one type of work)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. ERECT, MAINTAIN AND DISMANTLE PIPE SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | ic3t-wcy2 |
| 2012-11-16 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 121516092 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL ELECTRIC STEAM HIGH PRESSURE BOILER. | ic3t-wcy2 |
| 2011-07-19 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120763833 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL ELECTRIC STEAM HIGH PRESSURE BOILER. | ic3t-wcy2 |
| 2011-03-17 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120634992 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL TWO (2) ELECTRIC STEAM HIGH PRESSURE BOILERS IN ROOM 1502 AND 2005 PER PLANS. | ic3t-wcy2 |
| 2011-02-18 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120615557 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. AT 5TH FLOOR, REPLACE ONE GAS HIGH PRESSURE STEAM BOILER AND INSTALL SECOND GAS HIGH PRESSURE STEAM BOILER. AT 16TH FLOOR, INSTALL ELECTRIC HIGH PRESSURE STEAM BOILER. | ic3t-wcy2 |
| 2010-12-21 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120563595 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. REPLACE GAS FIRED HIGH PRESSURE BOILER AND INSTALL NEW HIGH PRESSURE ELECTRIC BOILER. | ic3t-wcy2 |
| 2010-10-27 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120512962 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. REPLACE ONE (1) GAS BOILER ON 8TH FLOOR AND ONE (1) ON 11TH FLOOR. INSTALL ONE (1) ADDITIONAL GAS BOILER AT 11TH FLOOR. | ic3t-wcy2 |
| 2010-07-27 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 120423773 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL THREE (3) ELECTRIC HIGH PRESSURE BOILERS. | ic3t-wcy2 |
| 2007-11-05 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 110014519 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. Installing storefront as shown on plan. No change of use, egress or occupancy. | ic3t-wcy2 |
| 2006-08-08 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 104513162 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. LEGALIZE GAS HIGH PRESSURE BOILER TO CORRECT ECB VIOLATION #32049674M. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION. | ic3t-wcy2 |
| 2003-06-17 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 103486345 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. Application filed for sidewalk and vault repair as shown on plans filed herewith. Separate filing for sidewalk permits as required, to be submitted directly to the NYC Dept of Transportation. No chan… | ic3t-wcy2 |
| 2003-05-16 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 103460210 (A3 – Minor alteration (one type of work)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. Installation of 133LF Heavy duty Sidewalk Shed @300psf. Installed for facade repair work, There will be no change to egress, use or occupancy. | ic3t-wcy2 |
| 2002-08-26 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 103247210 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. XELOCATE HIGH PRESSURE GAS BOILER FROM 9TH FLOOR TO 10TH FLOOR. INSTALL NEW BOILER ROOM ENCLOSURE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | ic3t-wcy2 |
| 2002-05-15 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 103155014 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. General construction and structural work in conjunction with sidewalk and vault repair/renovation. No change in use, egress or occupancy. | ic3t-wcy2 |

Showing 20 of 300. Full list: https://nycpropertyfacts.com/api/v1/property/1007870084/permits

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |

Showing 40 of 66. Full list: https://nycpropertyfacts.com/api/v1/property/1007870084/violations

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-13 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Fire Department Of Nyc: INSPECTION AND TESTING. Unpaid balance $300. | jz4z-kudi |
| 2025-07-31 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: OPERATING FUEL BURNING EQUIPMENT WITHOUT AN OPERATING CERTIFICATE 1ST. Unpaid balance $1,040. | jz4z-kudi |
| 2025-04-17 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2025-02-07 | open (DOCKETED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $1,300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-12-23 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 3RD AND SUB. Unpaid balance $720. | jz4z-kudi |
| 2024-11-23 | open (DEFAULTED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $1,000. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-11-16 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-08-22 | open (DOCKETED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 2ND OFF. Unpaid balance $1,950. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-08-21 | open (DEFAULTED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 3RD AND SUB. Unpaid balance $2,600. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-08-15 | open (DOCKETED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 3RD AND SUB. Unpaid balance $2,600. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-07-05 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-06-23 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 3RD AND SUB. Unpaid balance $780. | jz4z-kudi |
| 2024-06-22 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-06-22 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-06-04 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-04-15 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2024-01-11 | open (DEFAULTED · DEFAULTED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 2ND OFF. Unpaid balance $1,950. Respondent defaulted (did not appear). | jz4z-kudi |
| 2018-11-21 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Unpaid balance $455. | jz4z-kudi |
| 2026-03-30 | pending (RESCHEDULED) | OATH ticket from Fire Department Of Nyc: INSPECTION AND TESTING. Hearing pending. | jz4z-kudi |
| 2025-07-24 | pending (RESCHEDULED) | OATH ticket from Dep - Bureau Of Env. Complianc: IDLING OF MOTOR VEHICLE ENGINE MORE THAN THREE MINUTES 1ST OFF. Hearing pending. | jz4z-kudi |

Showing 20 of 26. Full list: https://nycpropertyfacts.com/api/v1/property/1007870084/hearings

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-30 | closed (Closed) | 311 request to DHS: Homeless Person Assistance – Non-Chronic. | erm2-nwe9 |
| 2026-07-24 | closed (Closed) | 311 request to DOB: General Construction/Plumbing – Site Conditions Endangering Workers. | erm2-nwe9 |
| 2026-02-24 | closed (Closed) | 311 request to DSNY: Snow or Ice – Sidewalk. | erm2-nwe9 |

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as 270 REALTY LLC. | 64uk-42ks |
| 1997-12-15 | recorded | Grantee (buyer) on the most recent deed (DEED, 1997-12-15). | 636b-3b5g |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/1007870084