# 4395 Broadway, Washington Heights (North), Manhattan, NY 10040

BBL 1021800315 · Block 2180 · Lot 315 · BIN 1064444, 1075611  
Canonical page: https://nycpropertyfacts.com/ny/manhattan/4395-broadway-1021800315  
Last updated: 2026-11-09 · Open-item counts as of 2026-11-09

Also recorded as: 4391 Broadway; 4389 Broadway; 4391-4399 Broadway

## Summary

4395 Broadway (Manhattan, NY 10040; tax lot BBL 1021800315) is a 60-unit elevator apartment building (building class D4: elevator co-op), built around 1940, on a 13,725 sq ft lot zoned R7-2. City tax records list the owner as 4395 BROADWAY LLC. The Department of Finance's final market value for tax year 2027 is $5,245,000. As of November 9, 2026, NYC Open Data shows three DOB jobs with a permit issued but no sign-off, four active DOB violations (two BIS violations and two DOB NOW safety violations), two active ECB violations, 17 open HPD violations and six OATH tickets with an unpaid balance. There were 44 311 requests in the past 12 months and 109 HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “4395 Broadway, Manhattan, NY 10040 (BBL 1021800315)”, data as of 2026-11-09, https://nycpropertyfacts.com/ny/manhattan/4395-broadway-1021800315. Source: NYC Open Data.

## Neighborhood

Washington Heights (North): https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north

- Open HPD violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north/open-hpd-violations
- Active DOB violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north/active-dob-violations
- Active ECB violations: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north/active-ecb-violations
- Open DOB jobs: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north/open-dob-jobs
- Unpaid OATH tickets: https://nycpropertyfacts.com/ny/manhattan/neighborhoods/washington-heights-north/unpaid-oath-tickets

## ZIP

Manhattan 10040: https://nycpropertyfacts.com/ny/manhattan/10040

## Nearby properties

Ordered by map distance among lots on this street within 40 house numbers and on this tax block within 15 lot numbers.

- 4381 Broadway (124 ft): https://nycpropertyfacts.com/ny/manhattan/4381-broadway-1021800309
- 4401 Broadway (130 ft): https://nycpropertyfacts.com/ny/manhattan/4401-broadway-1021800320
- 4396 Broadway (196 ft): https://nycpropertyfacts.com/ny/manhattan/4396-broadway-1021700006
- 4388 Broadway (211 ft): https://nycpropertyfacts.com/ny/manhattan/4388-broadway-1021700003
- 4380 Broadway (247 ft): https://nycpropertyfacts.com/ny/manhattan/4380-broadway-1021700001
- 4410 Broadway (251 ft): https://nycpropertyfacts.com/ny/manhattan/4410-broadway-1021700037
- 143 Bennett Avenue (118 ft): https://nycpropertyfacts.com/ny/manhattan/143-bennett-avenue-1021800326

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 3 |
| Active DOB violations (BIS) | 2 |
| Active DOB safety violations (DOB NOW) | 2 |
| Active ECB violations | 2 |
| Open HPD violations | 17 |
| OATH tickets with unpaid balance | 6 |

## Lot & building

- Owner of record: 4395 BROADWAY LLC
- Building class: D4 – Elevator co-op
- Year built: 1940
- Floors: 6
- Units: 60 residential / 60 total
- Lot area: 13,725 sq ft · Building area: 58,242 sq ft
- Zoning: R7-2, C2-4
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), city dataset updated 2026-08-24; last loaded 2026-11-09

## Tax assessment

- Tax year 2027 (final roll): market value $5,245,000, assessed value $2,360,250, tax class 2
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

| Date | Status | Description | Source |
|---|---|---|---|
| 2019-12-23 | recorded (DEED) | DEED dated 2019-12-23 from 4395 BROADWAY OWNERS CORP to 4395 BROADWAY LLC, no price stated ($0). | bnx9-e6tj |
| 1987-03-30 | recorded (DEED) | DEED dated 1987-03-30 from KRUMHOLZ, VICTOR LWT; KRUMHOLZ, JERROLD J.; CHRISTENFELD, RUTH E.; FINE, CHARLES J. TRST; MARCUS, ALAN J.; MIRCHIN, FLORENCE; MARCUS, RICHARD M. to 4395 BROADWAY OWNERSCRP, no price stated ($0). | bnx9-e6tj |
| 1983-11-29 | recorded (DEED) | DEED dated 1983-11-29 from KRUMHOLZ, VICTOR DEC'D; MARCUS, ERNESTINE KLWT; MARCUS, PHILIP N EXEC; KRUMHOLZ, GLORIA EXECTX; MIRCHIN, FLORENCE; KRUMHOLZ, JERROLD J.; CHRISTENFELD, RUTH E to CHRISTENFELD, RUTH E; KRUMHOLZ, JERROLD J.; MIRCHIN, FLORENCE; FINE, CHARLES J TR; MARCUS, ALAN J.; MARCUS, RICHARD M.; KRUMHOLZ, VICTOR DEC'D, no price stated ($0). | bnx9-e6tj |
| 1972-02-24 | recorded (DEED) | DEED dated 1972-02-24 from LANRICH REALTY CORP to CHRISTENFELD, RUTH E; MIRCHIN, FLORENCE; KRUMHOLZ, JEROLD J; KRUMHOLZ, VICTOR; MARCUS, ERNESTINE K, no price stated ($0). | bnx9-e6tj |

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2023-02-07 | open (Permit Entire) | DOB NOW job filing M00818033-S1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2023-01-29 | open (Permit Entire) | DOB NOW job filing M00818033-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2007-05-10 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 104761125 (A3 – Minor alteration (one type of work)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. Erection of 155 Linear feet of heavy duty sidewalk shed, as per BSA Minutes #351-74-SM. Sidewalk shed to comply with TPPN 9/99. Sidewalk shed is being erected for overhead protection during facade re… | ic3t-wcy2 |
| 2026-09-24 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: General Construction — remove and replace displaced section of retaining wall at rear lot line. Issued 2026-09-24, expires 2027-02-08. | rbx6-tga4 |
| 2026-09-24 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: Earth Work — remove and replace displaced section of retaining wall at rear lot line. Issued 2026-09-24, expires 2027-02-08. | rbx6-tga4 |
| 2025-08-25 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: Earth Work — remove and replace displaced section of retaining wall at rear lot line. Issued 2025-08-25, expires 2026-08-25. | rbx6-tga4 |
| 2025-08-25 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: General Construction — remove and replace displaced section of retaining wall at rear lot line. Issued 2025-08-25, expires 2026-08-25. | rbx6-tga4 |
| 2025-08-19 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-S1: Construction Fence — construction fence to enclose retaining wall repair work zone. Issued 2025-08-19, expires 2026-08-19. | rbx6-tga4 |
| 2024-03-01 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: General Construction — remove and replace displaced section of retaining wall at rear lot line. Issued 2024-03-01, expires 2025-03-01. | rbx6-tga4 |
| 2024-03-01 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: Earth Work — remove and replace displaced section of retaining wall at rear lot line. Issued 2024-03-01, expires 2025-03-01. | rbx6-tga4 |
| 2024-01-30 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-S1: Construction Fence — construction fence to enclose retaining wall repair work zone. Issued 2024-01-30, expires 2025-01-30. | rbx6-tga4 |
| 2023-06-28 | n/a (Signed-off) | DOB NOW work permit for job M00846557-I1: Antenna — Installation of new Dish Wireless telecom site. Installing 3 sectors of antennas with associated parts, 6 RRH units, 1 GPS antenna, and 1 equipment cabinet. Se…. Issued 2023-06-28, expires 2024-06-28. | rbx6-tga4 |
| 2023-03-03 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: Earth Work — remove and replace displaced section of retaining wall at rear lot line. Issued 2023-03-03, expires 2024-03-03. | rbx6-tga4 |
| 2023-03-03 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-I1: General Construction — remove and replace displaced section of retaining wall at rear lot line. Issued 2023-03-03, expires 2024-03-03. | rbx6-tga4 |
| 2023-02-13 | n/a (Permit Issued) | DOB NOW work permit for job M00818033-S1: Construction Fence — construction fence to enclose retaining wall repair work zone. Issued 2023-02-13, expires 2024-02-13. | rbx6-tga4 |
| 2022-11-29 | n/a (Signed-off) | DOB NOW work permit for job M00792195-I1: General Construction — FACADE REPAIR AS PER PLAN.. Issued 2022-11-29, expires 2023-11-29. | rbx6-tga4 |
| 2022-11-12 | n/a (Signed-off) | DOB NOW work permit for job M08038760-I1: Sidewalk Shed — INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC …. Issued 2022-11-12, expires 2023-11-12. | rbx6-tga4 |
| 2019-01-14 | n/a (Signed-off) | DOB NOW work permit for job M00115937-I1: Sidewalk Shed — INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE,EGRESS O…. Issued 2019-01-14, expires 2020-01-01. | rbx6-tga4 |
| 2019-01-14 | n/a (ISSUED (initial)) | BIS work permit for job 123250294: Equipment work / Other / general construction. Issued 2019-01-14, expires 2019-03-02. | ipu4-2q9a |
| 2007-05-16 | n/a (ISSUED (initial)) | BIS work permit for job 104761125: Construction equipment (scaffold, fence, shed) / Construction equipment. Issued 2007-05-16, expires 2007-12-31. | ipu4-2q9a |

Showing 20 of 22. Full list: https://nycpropertyfacts.com/api/v1/property/1021800315/permits

## Open violations (DOB, DOB NOW safety, ECB, HPD)

status "open" = DOB violation category is ACTIVE, DOB NOW safety violation status is Active, ECB violation status is ACTIVE, or HPD violation status is Open. Dismissed, cured, waived and disputed-successfully safety violations are not open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2023-02-22 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED): FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2001-02-27 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED). Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2026-03-17 | open (Active) | DOB NOW safety violation (AEUHAZ), type FTC-AEU-HAZ, VIO-FTC-AEU-HAZ-202603-0031314: no remarks published. Active. | 855j-jady |
| 2023-02-22 | open (Active) | DOB NOW safety violation (Facades), type FISPNRF, 022223FISPNRF00025: CYCLE 9B NO REPORT FILED. Active. | 855j-jady |
| 2025-09-22 | open (violation status ACTIVE; hearing status PENDING) | ECB (DOB) violation, class - 1: FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED; AT TIME OF INSPECTION APPROX. 60' LF OF 10'-0" TALL RETAINING WALL IN REAR YARD (EXP #3) IS IN STATE OF DISREPAIR WITH VERTICAL CRACKING PRESENT AND. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: hearing pending. Balance due $25,000. | 6bgk-3dad |
| 2026-10-21 | open (violation status ACTIVE; hearing status PENDING) | ECB (DOB) violation, class - 1: AT TIME OF INSPECTION FOUND RETAINING WALL AT REAR SIDE EXPOSURE # 3 IS IN DISREPAIR CONDITION AND SAGGING IN ONE DIRECTION ALSO CRACKS AT MANY PLACES AND VIOLATION # 39161218N ISSUED ON 09/22/2025 FOR FAILURE. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: hearing pending. Balance due $12,500. | 6bgk-3dad |
| 2026-03-12 | open (Nov Sent Out) | HPD class B violation (Class B) in apt 3K: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT ALL WALLS IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2026-03-12 | open (Nov Sent Out) | HPD class B violation (Class B) in apt 3K: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2026-03-04 | open (Not Complied With) | HPD class C violation (Class C): § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT AT BOILER ROOM. Open — not recorded as corrected. | wvxf-dwi5 |
| 2026-03-04 | open (Not Complied With) | HPD class A violation (Class A) in apt 1C: § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2026-03-04 | open (Not Complied With) | HPD class B violation (Class B) in apt 1C: § 27-2005 HMC: REFIT WINDOWS EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2024-03-07 | open (Notice Of Issuance Sent To Tenant) | HPD class C violation (Class C) in apt 5B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW FRAME, NORTH AND EAST WALLS AND THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''North''. Open — not recorded as corrected. | wvxf-dwi5 |
| 2023-06-30 | open (Not Complied With) | HPD class B violation (Class B): § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 6th STORY. Open — not recorded as corrected. | wvxf-dwi5 |
| 2022-03-17 | open (First No Access To Re- Inspect Violation) | HPD class B violation (Class B) in apt 2E: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2020-02-19 | open (Not Complied With) | HPD class A violation (Class A) in apt 4A: § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-10-28 | open (Not Complied With) | HPD class B violation (Class B) in apt 4A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 1 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 13141382 ISSUED 25-JUN-19 HAS BEEN UPGRADED TO CLASS B…. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-06-28 | open (Not Complied With) | HPD class A violation (Class A) in apt 4A: § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT LOCKNUT AT DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-06-28 | open (Not Complied With) | HPD class A violation (Class A) in apt 4A: § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-06-28 | open (Not Complied With) | HPD class A violation (Class A) in apt 4A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-06-24 | open (Not Complied With) | HPD class A violation (Class A) in apt 4E: § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF PARTITION WALL ERECTED FROM FLOOR TO CEILING WITH DOOR CREATING ADDITIONAL ROOM IN T…. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-02-14 | open (Not Complied With) | HPD class C violation (Class C) in apt 4A: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST. Open — not recorded as corrected. | wvxf-dwi5 |
| 2019-02-06 | open (Not Complied With) | HPD class A violation (Class A) in apt 5E: § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF PARTITION WALL ERECTED WITH DOOR CREATING ADDITIONAL ROOM IN THE 4th ROOM FROM EAST …. Open — not recorded as corrected. | wvxf-dwi5 |
| 2011-07-28 | open (First No Access To Re- Inspect Violation) | HPD class C violation (Class C) in apt 5A: § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN…. Open — not recorded as corrected. | wvxf-dwi5 |

## DOB safety violations (DOB NOW)

Active means the published violation status is Active. Dismissed, cured, waived, disputed successfully and pending dismissal are not open items.

| Issued | Status | Type | Device | Number | Remarks |
|---|---|---|---|---|---|
| 2026-03-17 | open (Active) | FTC-AEU-HAZ | AEUHAZ | VIO-FTC-AEU-HAZ-202603-0031314 | — |
| 2023-02-22 | open (Active) | FISPNRF | Facades | 022223FISPNRF00025 | CYCLE 9B NO REPORT FILED |

2 resolved or not active. Full list: https://nycpropertyfacts.com/api/v1/property/1021800315/violations?type=dob_safety_violation

Source: DOB Safety Violations (DOB NOW) (https://data.cityofnewyork.us/Building/DOB-Safety-Violations/855j-jady), city dataset updated 2026-11-09; last loaded 2026-11-09

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-03-19 | open (HEARING COMPLETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAILURE TO MAINTAIN ELEVATOR OR CONVEYING SYSTEM. Unpaid balance $312. | jz4z-kudi |
| 2022-01-20 | open (DOCKETED · DEFAULTED) | OATH ticket from Dept. Of Buildings: FAIL TO COMPLY W COMMISSIONER ORDER TO FILE CERT OF CORRECTION W DOB. Unpaid balance $5,000. Respondent defaulted (did not appear). | jz4z-kudi |
| 2021-11-22 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAIL TO COMPLY W COMMISSIONER ORDER TO FILE CERT OF CORRECTION W DOB. Unpaid balance $3,125. | jz4z-kudi |
| 2021-10-08 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAIL TO COMPLY W COMMISSIONER ORDER TO FILE CERT OF CORRECTION W DOB. Unpaid balance $1,250. | jz4z-kudi |
| 2021-08-21 | open (DOCKETED · DEFAULTED) | OATH ticket from Dept. Of Buildings: FAIL TO COMPLY W COMMISSIONER ORDER TO FILE CERT OF CORRECTION W DOB. Unpaid balance $3,125. Respondent defaulted (did not appear). | jz4z-kudi |
| 2021-07-12 | open (DOCKETED · IN VIOLATION) | OATH ticket from Dept. Of Buildings: FAILURE TO MAINTAIN BUILDING WALL S OR APPURTENANCES. Unpaid balance $2,500. | jz4z-kudi |
| 2026-10-21 | pending (NEW ISSUANCE) | OATH ticket from Dept. Of Buildings: FAILURE TO MAINTAIN BUILDING WALL S OR APPURTENANCES. Hearing pending. | jz4z-kudi |

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-11-08 | open (OPEN) | HPD complaint (apt 3K): Heat/Hot Water – Entire Building. The following complaint conditions are still open. HPD has already attempted to notify the property owner that the condition exists; the tenant should provide access for the owner to make the repair.… | ygpa-z7cr |
| 2026-04-07 | closed (CLOSE) | HPD complaint (apt 3F): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2026-02-27 | closed (CLOSE) | HPD complaint (apt 3K): Electric – No Lighting; Unsanitary Condition – Mold. HPD inspected this condition so the complaint has been closed. Violations were issued. The law provides the property owner time to correct the condition(s). Violation descriptions and the dates for t… | ygpa-z7cr |
| 2026-02-17 | closed (CLOSE) | HPD complaint (apt 1C): Plumbing – Toilet; Door/Window – Window Frame. HPD inspected this condition so the complaint has been closed. Violations were issued. The law provides the property owner time to correct the condition(s). Violation descriptions and the dates for t… | ygpa-z7cr |
| 2026-02-17 | closed (CLOSE) | HPD complaint (apt 1C): Door/Window – Door. HPD inspected this condition so the complaint has been closed. Violations were issued. The law provides the property owner time to correct the condition(s). Violation descriptions and the dates for t… | ygpa-z7cr |
| 2026-02-09 | closed (CLOSE) | HPD complaint (apt 3K): Water Leak – Slow Leak; Unsanitary Condition – Mold. HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed. | ygpa-z7cr |
| 2026-02-09 | closed (CLOSE) | HPD complaint (apt 3K): Heat/Hot Water – Apartment Only. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2026-02-03 | closed (CLOSE) | HPD complaint (apt 1C): Heat/Hot Water – Apartment Only; Plumbing – Radiator. The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been close… | ygpa-z7cr |
| 2026-02-03 | open (OPEN) | HPD complaint (apt 1C): General – Cabinet; Plumbing – Toilet; Door/Window – Window Frame. The following complaint conditions are still open. HPD has already attempted to notify the property owner that the condition exists; the tenant should provide access for the owner to make the repair.… | ygpa-z7cr |
| 2026-01-17 | closed (CLOSE) | HPD complaint (apt BLDG): Heat/Hot Water – Entire Building. More than one complaint was received for this building-wide condition. This complaint status is for the initial complaint.The Department of Housing Preservation and Development contacted a tenant in … | ygpa-z7cr |
| 2026-01-16 | closed (CLOSE) | HPD complaint (apt BLDG): Heat/Hot Water – Entire Building. HPD inspected this condition so the complaint has been closed. Violations were issued. The law provides the property owner time to correct the condition(s). Violation descriptions and the dates for t… | ygpa-z7cr |
| 2026-01-01 | closed (CLOSE) | HPD complaint (apt 3F): Heat/Hot Water – Apartment Only. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2025-12-30 | closed (CLOSE) | HPD complaint (apt BLDG): Heat/Hot Water – Entire Building. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2025-12-26 | closed (CLOSE) | HPD complaint (apt 3F): Heat/Hot Water – Apartment Only. HPD responded to a complaint of no heat or hot water in the building. An occupant of the building confirmed heat and hot water had been restored when the Inspector attempted to conduct the inspection… | ygpa-z7cr |
| 2025-12-24 | closed (CLOSE) | HPD complaint (apt 5H): Heat/Hot Water – Entire Building. More than one complaint was received for this building-wide condition. This complaint status is for the initial complaint.HPD called the telephone number on file for this complaint. Someone at that n… | ygpa-z7cr |

Showing 15 of 153. Full list: https://nycpropertyfacts.com/api/v1/property/1021800315/complaints

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as 4395 BROADWAY LLC. | 64uk-42ks |
| 2019-12-23 | recorded | Grantee (buyer) on the most recent deed (DEED, 2019-12-23). | 636b-3b5g |
| 2026-09-18 | current_registration | HPD registration contact: Agent Ezriel Weinberger, business city Brooklyn. | feu5-w2e2 |
| 2026-09-18 | current_registration | HPD registration contact: Shareholder Ezriel Weinberger, business city Brooklyn. | feu5-w2e2 |
| 2026-09-18 | current_registration | HPD registration contact: CorporateOwner (4395 BROADWAY OWENERS CORP), business city Ny. | feu5-w2e2 |
| 2026-09-18 | current_registration | HPD registration contact: HeadOfficer Ezriel Weinberger, business city Brooklyn. | feu5-w2e2 |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/1021800315