# Maspeth Avenue, Brooklyn, NY 11211

BBL 3028850025 · Block 2885 · Lot 25 · BIN 3338306, 3338309  
Canonical page: https://nycpropertyfacts.com/ny/brooklyn/maspeth-avenue-3028850025  
Last updated: 2026-11-03 · Open-item counts as of 2026-10-31

Also recorded as: 269 Skillman Ave; 300 Skillman Ave

## Summary

Maspeth Avenue (Brooklyn, NY 11211; tax lot BBL 3028850025) is a 45-unit asylum or home (building class N9: asylum or home (subtype N9)), built around 1910, on a 72,060 sq ft lot zoned R7-2. City tax records list the owner as NYC DEPARTMENT OF HOMELESS SERVICES. The Department of Finance's final market value for tax year 2027 is $6,543,000. As of October 31, 2026, NYC Open Data shows one active DOB violation, 28 active ECB violations and two OATH tickets with an unpaid balance. There were seven 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “Maspeth Avenue, Brooklyn, NY 11211 (BBL 3028850025)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/brooklyn/maspeth-avenue-3028850025. Source: NYC Open Data.

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 0 |
| Active DOB violations | 1 |
| Active ECB violations | 28 |
| Open HPD violations | 0 |
| OATH tickets with unpaid balance | 2 |

## Lot & building

- Owner of record: NYC DEPARTMENT OF HOMELESS SERVICES
- Building class: N9 – Asylum or home (subtype N9)
- Year built: 1910
- Floors: 6
- Units: 45 residential / 46 total
- Lot area: 72,060 sq ft · Building area: 127,279 sq ft
- Zoning: R7-2
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), data as of 2026-11-04

## Tax assessment

- Tax year 2027 (final roll): market value $6,543,000, assessed value $2,944,350, tax class 4
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

No records found.

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-02-25 | n/a (Signed-off) | DOB NOW work permit for job B01355857-I1: Boiler Equipment — RE-FILING OF NYC DOBNOW# B00280875-I1 TO REPLACE (1) BOILER AND (1) GAS BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. Issued 2026-02-25, expires 2026-06-01. | rbx6-tga4 |
| 2026-02-25 | n/a (Signed-off) | DOB NOW work permit for job B01355858-I1: Boiler Equipment — RE-FILING OF NYC DOBNOW# B00280875-I1 TO REGISTER (2) BOILERS AND (2) GAS BURNERS AS PERPLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. Issued 2026-02-25, expires 2026-06-01. | rbx6-tga4 |

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2013-01-31 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED): FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-01-09 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS#39091217K ISSUED ON 05/30/23 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01, COMPLY WITH COMMISS. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FOUND HB SMITH BOILER MODEL 28HE-18 UNREGISTERED., MAINTAIN BOILER; OBTAIN THE PROPER PERMIT AND REGISTER THE BOILER. SUBMIT A CERTIFICATE OF CORRECTION.. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2022-05-27 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED IN GAS METER ROOM( NEXT TO SPRINKLER ROOM) IN BASEMENT/CELLAR IMPROPERLY VENTED. YOU CAN NOT VENT FROM ONE ROOM TO ANOTHER., REPAIR AND/OR REPLACE. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2022-05-27 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: AT CELLAR LEVEL, ELECTRICAL, BOILER, GAS METER ROOMS & CORRIDORS, SEVERAL OPENING DUE PIPES PENETRATION THROUGH THE FIRE PROOF WALLS/CEILING, MISSING CMU AND OTHER OPENING WITHOUT FIRE STOPPING PROVIDED, PROVID. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-OF-SERVICE REMEDY: RESTORE TO SERVICE IMMEDIATELY AND, NOTIFY NYCDOB THE DEVICE HAS BEEN RETURNED TO SERVICE. E-MAIL EIR@BUILDINGS.NYC.GOV SO AN IN. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2026-02-09 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: 97-X- 17 THE ONLY ELEVATOR IN BUILDING IN BUILDING OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE CREATING A HAZARDOUS CONDITION AS PER RCNY 11-02. REMEDY RESTORE TO SERVICE IMMEDIATE. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-OF-SERVICE REMEDY: RESTORE TO SERVICE IMMEDIATELY AND, NOTIFY NYCDOB THE DEVICE HAS BEEN RETURNED TO SERVICE. E-MAIL EIR@BUILDINGS.NYC.GOV SO AN IN. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2025-12-10 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: BURNHAM STEAM BOILER MODEL# 28-HE-18 IS NOT REGISTERED. REGISTER BOILER AND SUBMIT A CERTIFICATE OF CORRECTION.. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2025-12-10 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: ON FLOORS 3,4,5 SPRINKLER HEADS WITH OBSTRUCTION. SHOWER HEADS MISSING ON FLOORS 4 AND 5. ON THE FIRST FLOOR SPRINKLER VALVE LIMITED ACCESS AND THE FDC HOSE CONNECTION THREADS LACK PROPER PROTECTION. THROUGHOUT. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-10-23 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE TO SERVICE AND CALL THE DOB. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FOUND HB SMITH BOILER MODEL 28HE18 SERIAL # 28HE-18-116397 UNREGISTERED., MAINTAIN BOILER; OBTAIN THE PROPER PERMIT AND REGISTER THE BOILER. SUBMIT A CERTIFICATE OF CORRECTION.. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED: FIRE PROOF SELF-CLOSING DOOR AT CELLAR LEVEL STAIR A, E, GAS METER ROOM, WATER MITER, BOILER ROOM, DOORS NOT SELF-CLOSING PROPERLY DUE OVERLAPPING, KNOCKING OF DOOR FRAME AND OTHER FAILURES. PREVIOUS. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2024-04-05 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39091217K ISSUED ON 05/30/2023 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FAILUR. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-OF-SERVICE REMEDY: RESTORE TO SERVICE IMMEDIATELY AND, NOTIFY NYCDOB THE DEVICE HAS BEEN RETURNED TO SERVICE. E-MAIL EIR@BUILDINGS.NYC.GOV SO AN IN. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2025-08-14 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE TO SERVICE AND CONTACT THE DOB ELEVATOR DIVISION AT ELEVATORIR@BUILDINGS.NYC.GOV. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED ACTIVE WATER LEAKS THROUGHOUT THE BASEMENT/CELLAR. AS PER PC 102.3 MAINTENANCE. INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN PROPER OPERATING CONDITION IN ACCORDANCE W. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-04-04 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: 1) THE ONLY ELEVATOR IN SECTION OF BUILDING OR BUILDING IS OUT-OF-SERVICE. UPON INSPECTION THE DEVICE IS FOUND TO BE OUT-OF-SERVICE CREATING A HAZARDOUS CONDITION AS PER 1RCNY 11-02. RESTORE TO SERVICE IMMEDIAT. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2022-05-27 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED IN 2ND GAS METER ROOM IN BASEMENT/CELLAR EXCESSIVE STORAGE. NO STORAGE SHALL BE KEPT IN THE GAS METER ROOM., REPAIR AND/OR REPLACE. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2025-03-03 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE TO SERVICEAND CONTACT THE DOB ELEVATOR DIVISION AT ELEVATORIR@BUILDINGS.NYC.GOV. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED: AT CELLAR LEVEL, BOILER ROOM (OLD BOILER), METALLIC EMERGENCY EXIT STAIR (2) ONE LADDER IS DAMAGED/BROKEN AND THE OTHER IS COLLAPSED DUE TO FLOODING OR HIGH WATER TABLE., REPAIR AND/OR REPLACE. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED: AT CELLAR LEVEL, BOILER ROOM (OLD BOILER), METALLIC STRUCTURE THAT SUPPORTS THE ROOF (COLUMNS), SHOW ADVANCED CORROSION WITH HOLES AND WEAR ON ITS EDGES AT THE BASE/BOTTOM , REDUCING THE CAPACITY AND. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-10-23 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED IN THE GAS METER ROOM ADJACENT FROM THE SPRINKLER ROOM VENTILATION INSTALLED IMPROPERLY. GAS METER IS BEING VENT INTO THE SPRINKLER ROOM, NOT OUTSIDE. ALSO JIM CAPS AND FERNCO COUPLINGS INSTALLED ON CA. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FOUND HB SMITH BOILER MODEL 28HE-18 SERIAL # 28A-18-115350 UNREGISTERED., MAINTAIN BOILER; OBTAIN THE PROPER PERMIT AND REGISTER THE BOILER. SUBMIT A CERTIFICATE OF CORRECTION.. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-10-23 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED IN THE GAS METER ROOM LOCATED IN THE BASEMENT/CELLAR EXCESSIVE STORAGE. AS PER E 3 OF THE FGC NO STORAGE PERMITTED" SHALL BE PERMANENTLY AND CONSPICUOUSLY POSTED ON THE EXTERIOR OF THE METER ROOM DOOR.. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-05-30 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: I OBSERVED IN THE BASEMENT AREA ALONG THE PATH TO THE MAIN ELECTRICAL ROOM THE IMPROPER CONNECTION OF TEMP WIRE THE TERMINATION OF CONDUCTORS IS EXPOSED WITH ENERGIZED CONDUCTORS PASSING THROUGH A DOORWAY AND T. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2022-05-27 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: FIRE PROOF SELF-CLOSING DOOR AT CELLAR LEVEL STAIR A, E, GAS METER ROOM, WATER MITER, BIOLER ROOM, DOORS NOT SELF-CLOSING PROPERLY DUE OVERLAPPING, KNOCKING OF DOOR FRAME AND OTHER FAILURES., REPAIR/REPLACE DOO. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2025-08-14 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 1: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE TO SERVICE AND CONTACT THE DOB ELEVATOR DIVISION AT ELEVATORIR@BUILDINGS.NYC.GOV. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |
| 2023-01-31 | open (violation status ACTIVE; hearing status POP/IN-VIO) | ECB (DOB) violation, class - 2: OBSERVED: AT CELLAR LEVEL, ELECTRICAL, BOILER, GAS METER ROOMS & CORRIDORS, SEVERAL OPENING DUE PIPES PENETRATION THROUGH THE FIRE PROOF WALLS/CEILING, MISSING CMU AND OTHER OPENING WITHOUT FIRE STOPPING PROVID. Violation status (DOB): active (open; not resolved in DOB records). Hearing/penalty status: pop/in-vio. | 6bgk-3dad |

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2023-03-19 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: STORAGE OF RECEPTACLES 1ST OCCURRENCE. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2023-03-15 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: IMPROPER DISPOSAL--BEDDING 1ST OCCURRENCE. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-10-26 | closed (Closed) | 311 request to DOB: Elevator – Elevator - Multiple Devices On Property. | erm2-nwe9 |
| 2026-08-10 | closed (Closed) | 311 request to NYPD: Noise - Street/Sidewalk – Loud Music/Party. | erm2-nwe9 |
| 2026-05-04 | closed (Closed) | 311 request to DEP: Water System – Hydrant Leaking (WC1). | erm2-nwe9 |
| 2026-03-27 | closed (Closed) | 311 request to NYPD: Illegal Parking – Blocked Sidewalk. | erm2-nwe9 |
| 2025-12-30 | closed (Closed) | 311 request to DEP: Water System – Leak (Use Comments) (WA2). | erm2-nwe9 |
| 2025-12-10 | closed (Closed) | 311 request to DOB: Boilers – Boiler - Defective/Inoperative/No Permit. | erm2-nwe9 |
| 2025-12-10 | closed (Closed) | 311 request to DOB: Elevator – Elevator - Multiple Devices On Property. | erm2-nwe9 |

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as NYC DEPARTMENT OF HOMELESS SERVICES. | 64uk-42ks |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/3028850025