# Avenue X, Brooklyn, NY 11223

BBL 3072080040 · Block 7208 · Lot 40 · BIN 3415983, 3412408, 3415979, 3412395, 3795019, 3415973, 3412413, 3423809, 3412404, 3412411, 3412402, 3415977, 3415976, 3412396, 3795017, 3412405, 3412414, 3412406, 3424394, 3412407, 3412403, 3412393, 3412432, 3412429, 3412394, 3412435, 3412397, 3415982, 3412417, 3412418, 3412431, 3412409, 3412398, 3412433, 3412430, 3412415, 3412451, 3415974, 3415980, 3415972, 3820882  
Canonical page: https://nycpropertyfacts.com/ny/brooklyn/avenue-x-3072080040  
Last updated: 2026-10-31 · Open-item counts as of 2026-10-31

Also recorded as: 2556 Mc Donald Ave; 2556 Mcdonald Ave; 2556 Shell Rd

## Summary

Avenue X (Brooklyn, NY 11223; tax lot BBL 3072080040) is an utility property (building class U7: utility property (subtype U7)), on a 2,830,528 sq ft lot zoned C8-1. City tax records list the owner as NYC TRANSIT AUTHORITY. As of October 31, 2026, NYC Open Data shows six DOB jobs with a permit issued but no sign-off and 32 active DOB violations. There were eight 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “Avenue X, Brooklyn, NY 11223 (BBL 3072080040)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/brooklyn/avenue-x-3072080040. Source: NYC Open Data.

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 6 |
| Active DOB violations | 32 |
| Active ECB violations | 0 |
| Open HPD violations | 0 |
| OATH tickets with unpaid balance | 0 |

## Lot & building

- Owner of record: NYC TRANSIT AUTHORITY
- Building class: U7 – Utility property (subtype U7)
- Year built: —
- Floors: —
- Units: 0 residential / 0 total
- Lot area: 2,830,528 sq ft · Building area: 0 sq ft
- Zoning: C8-1
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), data as of 2026-11-01

## Tax assessment

- Tax year 2027 (final roll): market value $0, assessed value $0, tax class 3
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

No records found.

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-12-04 | open (Permit Entire) | DOB NOW job filing B01208246-S4 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-09-24 | open (Permit Entire) | DOB NOW job filing B01208246-S2 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-09-22 | open (Permit Entire) | DOB NOW job filing B01208246-S1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-09-21 | open (Permit Entire) | DOB NOW job filing B01208246-S3 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2025-09-12 | open (Permit Entire) | DOB NOW job filing B01208246-I1 (Alteration): Permit Entire — permit issued, no sign-off on record. | w9ak-ipjd |
| 2015-11-17 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 321234311 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. REPLACE (3) NEW HIGH PRESSURE STEAM BOILERS/BURNERS. INSTALL DOUBLEWALL METAL BREECHING AND CHIMNEY FOR EACH BOILER. REPLACEMENT (3) 20,000 GALLON OIL TANKS FIBERGLASS CLADDED IN EXISTING 3HR ENCLOSU… | ic3t-wcy2 |
| 2026-10-26 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-I1: Mechanical Systems — THE REMOVAL OF EXISTING AIR TERMINALS AND DUCTWORK. THE REPLACEMENT OF EXISTING ROOFTOP AIR HANDLERS, EXHAUST AIR UNIT, AND ASSOCIATED DUCTWORK, PIPING, CONTRO…. Issued 2026-10-26, expires 2027-06-21. | rbx6-tga4 |
| 2025-12-24 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S4: Plumbing — Plumbing scope includes demolishing existing fixtures and piping, installing new sanitary and plumbing systems, adding TMVs and trap primers, relocating the re…. Issued 2025-12-24, expires 2026-12-24. | rbx6-tga4 |
| 2025-12-23 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S2: General Construction — General Construction Work as shown on the Plans submitted herewith.. Issued 2025-12-23, expires 2026-12-23. | rbx6-tga4 |
| 2025-12-23 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S3: Structural — Structural work as shown on plans filed herewith. No changes to egress, occupancy and use as of right.. Issued 2025-12-23, expires 2026-12-23. | rbx6-tga4 |
| 2025-11-14 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-I1: Mechanical Systems — THE REMOVAL OF EXISTING AIR TERMINALS AND DUCTWORK. THE REPLACEMENT OF EXISTING ROOFTOP AIR HANDLERS, EXHAUST AIR UNIT, AND ASSOCIATED DUCTWORK, PIPING, CONTRO…. Issued 2025-11-14, expires 2026-06-21. | rbx6-tga4 |
| 2025-11-12 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S1: Sprinklers — ELOCATION OF EXISTING WET SPRINKLERS AS INDICATED ON PLANS AND ADJUST ASSOCIATEDEXISTING PIPING. RECONNECT EXISTING SPRINKLER PIPING WITH NEW. Issued 2025-11-12, expires 2026-11-12. | rbx6-tga4 |
| 2025-11-10 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S3: Structural — Structural work as shown on plans filed herewith. No changes to egress, occupancy and use as of right.. Issued 2025-11-10, expires 2026-01-01. | rbx6-tga4 |
| 2025-11-10 | n/a (Permit Issued) | DOB NOW work permit for job B01208246-S2: General Construction — General Construction Work as shown on the Plans submitted herewith.. Issued 2025-11-10, expires 2026-01-01. | rbx6-tga4 |
| 2017-03-22 | n/a (ISSUED (renewal)) | BIS work permit for job 321234311: Plumbing / Plumbing. Issued 2017-03-22, expires 2018-03-22. | ipu4-2q9a |
| 2015-12-04 | n/a (ISSUED (initial)) | BIS work permit for job 321234311: Equipment work / Fuel burning. Issued 2015-12-04, expires 2016-07-19. | ipu4-2q9a |
| 2015-12-04 | n/a (ISSUED (initial)) | BIS work permit for job 321234311: Equipment work / Fuel storage. Issued 2015-12-04, expires 2016-07-19. | ipu4-2q9a |
| 2015-12-04 | n/a (ISSUED (initial)) | BIS work permit for job 321234311: Equipment work / Boiler. Issued 2015-12-04, expires 2016-07-19. | ipu4-2q9a |
| 2015-12-04 | n/a (ISSUED (initial)) | BIS work permit for job 321234311: Plumbing / Plumbing. Issued 2015-12-04, expires 2016-12-03. | ipu4-2q9a |
| 2015-12-04 | n/a (ISSUED (initial)) | BIS work permit for job 321234311: Equipment work / Other / general construction. Issued 2015-12-04, expires 2016-07-19. | ipu4-2q9a |

Showing 20 of 25. Full list: https://nycpropertyfacts.com/api/v1/property/3072080040/permits

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-03-16 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-03-16 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-03-16 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-03-16 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2020-03-16 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

No records found.

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-10-09 | closed (Closed) | 311 request to DOT: Street Condition – Line/Marking - After Repaving. | erm2-nwe9 |
| 2026-09-23 | closed (Closed) | 311 request to DEP: Noise – Construction. | erm2-nwe9 |
| 2026-08-06 | closed (Closed) | 311 request to DOT: Sidewalk Condition – Broken Sidewalk. | erm2-nwe9 |
| 2026-07-08 | closed (Closed) | 311 request to DOB: General Construction/Plumbing – Cons - Contrary/Beyond Approved Plans/Permits. | erm2-nwe9 |
| 2026-06-16 | closed (Closed) | 311 request to NYPD: Illegal Parking – Blocked Sidewalk. | erm2-nwe9 |
| 2026-05-05 | closed (Closed) | 311 request to NYPD: Illegal Parking – Blocked Sidewalk. | erm2-nwe9 |
| 2026-03-21 | closed (Closed) | 311 request to DOT: Street Condition – Pothole. | erm2-nwe9 |
| 2026-02-26 | closed (Closed) | 311 request to NYPD: Illegal Parking – Blocked Sidewalk. | erm2-nwe9 |

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as NYC TRANSIT AUTHORITY. | 64uk-42ks |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/3072080040