# 855 65th Street, Brooklyn, NY 11220

BBL 3057420057 · Block 5742 · Lot 57 · BIN 3328759, 3328758  
Canonical page: https://nycpropertyfacts.com/ny/brooklyn/855-65th-street-3057420057  
Last updated: 2026-10-31 · Open-item counts as of 2026-11-05

Also recorded as: 841 65 St; 845 65 St; 833 65 St

## Summary

855 65th Street (Brooklyn, NY 11220; tax lot BBL 3057420057) is a warehouse (building class E9: warehouse (subtype E9)), built around 1923, on a 20,800 sq ft lot zoned M1-1. City tax records list the owner as GREAT EMPIRE 65 REALTY LLC; per ACRIS, a deed to this owner dated August 29, 2013 lists a price of $6,500,000. The Department of Finance's final market value for tax year 2027 is $4,488,000. As of November 5, 2026, NYC Open Data shows five DOB jobs with a permit issued but no sign-off, 52 active DOB violations, one active ECB violation and 10 OATH tickets with an unpaid balance. There were 12 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “855 65th Street, Brooklyn, NY 11220 (BBL 3057420057)”, data as of 2026-11-05, https://nycpropertyfacts.com/ny/brooklyn/855-65th-street-3057420057. Source: NYC Open Data.

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 5 |
| Active DOB violations | 52 |
| Active ECB violations | 1 |
| Open HPD violations | 0 |
| OATH tickets with unpaid balance | 10 |

## Lot & building

- Owner of record: GREAT EMPIRE 65 REALTY LLC
- Building class: E9 – Warehouse (subtype E9)
- Year built: 1923
- Floors: 2
- Units: 0 residential / 5 total
- Lot area: 20,800 sq ft · Building area: 42,796 sq ft
- Zoning: M1-1
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), data as of 2026-11-05

## Tax assessment

- Tax year 2027 (final roll): market value $4,488,000, assessed value $2,019,600, tax class 4
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

| Date | Status | Description | Source |
|---|---|---|---|
| 2013-08-29 | recorded (DEED) | DEED dated 2013-08-29 from E.E.M. REALTY INC. to GREAT EMPIRE 65 REALTY LLC, stated price $6,500,000. | bnx9-e6tj |
| 1967-10-27 | recorded (DEED) | DEED dated 1967-10-27 from 845 65TH ST CORP to E E M REALTY INC, no price stated ($0) for a deed covering 2 lots. | bnx9-e6tj |

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2007-01-17 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 302283936 (A3 – Minor alteration (one type of work)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALLATION OF 50 L.F.TEMPORARY HEAVY DUTY SIDEWALK SHED FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | ic3t-wcy2 |
| 1999-01-27 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 300830028 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. REPLACE GAS FIRED OACKAGE BOILER AND CON NECT TO EXISTING GAS SERVICE.NO CHANGE IN EGRESS,OCCUPANCY,OR USE UNDER THIS APPLICATION.LOCAL LAW 17/95 DOES NO T APPLY TO THIS APPLICATION. | ic3t-wcy2 |
| 1998-10-16 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 300801078 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. REPLACE GAS FIRED PACKAGE BOILER AND CO NNECT TO EXISTING GAS SERVICE. O CHANGE IN EGRESS, OCCUPANCY OR USE UND ER THIS APPLICATION. LOCAL LAW 17/95 DO S NOT APPLY TO THIS APPLICATION | ic3t-wcy2 |
| 1997-07-01 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 300650917 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL SIDEWALK FENCE. INSTALL WASTE OI L STORAGE TANKS WITH OIL INTERCEPTOR; NO CHAN GE IN EGRESS, USE OR OCCUPANCY | ic3t-wcy2 |
| 1997-05-27 | open (PERMIT ISSUED - PARTIAL JOB) | BIS job 300640634 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - PARTIAL JOB — permit issued, no sign-off on record. AUTO LIFTS TOILETS, EMPTY DOORS,CONCRETE RAMP PARTITONS. | ic3t-wcy2 |
| 2007-01-18 | n/a (ISSUED (initial)) | BIS work permit for job 302283936: Construction equipment (scaffold, fence, shed) / Construction equipment. Issued 2007-01-18, expires 2007-09-09. | ipu4-2q9a |
| 2002-05-17 | n/a (ISSUED (initial)) | BIS work permit for job 301290831: Sign. Issued 2002-05-17, expires 2002-06-30. | ipu4-2q9a |
| 2001-05-25 | n/a (ISSUED (initial)) | BIS work permit for job 301130620: Equipment work / Mechanical/HVAC. Issued 2001-05-25, expires 2002-05-23. | ipu4-2q9a |
| 2001-05-15 | n/a (ISSUED (initial)) | BIS work permit for job 301130620: Equipment work / Sprinkler. Issued 2001-05-15, expires 2002-05-15. | ipu4-2q9a |
| 2001-05-08 | n/a (ISSUED (initial)) | BIS work permit for job 301130620: Plumbing / Plumbing. Issued 2001-05-08, expires 2002-05-08. | ipu4-2q9a |
| 2001-03-06 | n/a (ISSUED (initial)) | BIS work permit for job 301130620: Equipment work / Other / general construction. Issued 2001-03-06, expires 2001-05-31. | ipu4-2q9a |
| 2001-02-28 | n/a (ISSUED (initial)) | BIS work permit for job 301130620: Construction equipment (scaffold, fence, shed) / Construction equipment. Issued 2001-02-28, expires 2001-05-31. | ipu4-2q9a |
| 1999-02-12 | n/a (ISSUED (initial)) | BIS work permit for job 300830028: Plumbing / Plumbing. Issued 1999-02-12, expires 2000-02-12. | ipu4-2q9a |
| 1999-02-12 | n/a (ISSUED (initial)) | BIS work permit for job 300830028: Plumbing / Plumbing. Issued 1999-02-12, expires 2000-02-12. | ipu4-2q9a |
| 1999-02-12 | n/a (ISSUED (initial)) | BIS work permit for job 300830028: Equipment work / Boiler. Issued 1999-02-12, expires 1999-05-01. | ipu4-2q9a |
| 1998-10-28 | n/a (ISSUED (initial)) | BIS work permit for job 300801078: Equipment work / Boiler. Issued 1998-10-28, expires 1999-05-01. | ipu4-2q9a |
| 1998-10-28 | n/a (ISSUED (initial)) | BIS work permit for job 300801078: Plumbing / Plumbing. Issued 1998-10-28, expires 1999-10-28. | ipu4-2q9a |
| 1997-07-25 | n/a (ISSUED (initial)) | BIS work permit for job 300650917: Equipment work / Fuel storage. Issued 1997-07-25, expires 1997-11-01. | ipu4-2q9a |
| 1997-07-07 | n/a (ISSUED (initial)) | BIS work permit for job 300640634: Equipment work / Other / general construction. Issued 1997-07-07, expires 1998-05-16. | ipu4-2q9a |
| 1997-07-07 | n/a (ISSUED (initial)) | BIS work permit for job 300640634: Plumbing / Plumbing. Issued 1997-07-07, expires 1998-07-07. | ipu4-2q9a |

Showing 20 of 26. Full list: https://nycpropertyfacts.com/api/v1/property/3057420057/permits

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |

Showing 40 of 53. Full list: https://nycpropertyfacts.com/api/v1/property/3057420057/violations

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-07-05 | open (DEFAULTED · DEFAULTED) | OATH ticket from Sanitation Recycling: IMPROPER DISPOSAL - 1ST OFFENSE. Unpaid balance $75. Respondent defaulted (did not appear). | jz4z-kudi |
| 2025-06-23 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: DIRTY SIDEWALK COMM MAN INDUSTRIAL MIXED USE 1ST. Unpaid balance $450. Respondent defaulted (did not appear). | jz4z-kudi |
| 2025-06-06 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: DIRTY SIDEWALK. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-04-24 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: FAILURE TO CLEAN 18 INCHES INTO STREET. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-04-24 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: FAILURE TO CLEAN 18 INCHES INTO STREET. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-03-30 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: LOOSE RUBBISH 1ST OCCURRENCE. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2024-03-30 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: DIRTY SIDEWALK. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2022-12-14 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: LOOSE RUBBISH 1ST OCCURRENCE. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2021-03-16 | open (DOCKETED · DEFAULTED) | OATH ticket from Sanitation Others: DIRTY SIDEWALK DIRTY AREA. Unpaid balance $300. Respondent defaulted (did not appear). | jz4z-kudi |
| 2018-10-26 | open (DOCKETED · DEFAULTED) | OATH ticket from Fire Department Of Nyc: PERMITS. Unpaid balance $1,000. Respondent defaulted (did not appear). | jz4z-kudi |
| 2026-10-09 | pending (NEW ISSUANCE) | OATH ticket from Sanitation Others: DIRTY SIDEWALK. Hearing pending. | jz4z-kudi |
| 2026-10-09 | pending (NEW ISSUANCE) | OATH ticket from Sanitation Others: DIRTY SIDEWALK. Hearing pending. | jz4z-kudi |
| 2026-10-08 | pending (NEW ISSUANCE) | OATH ticket from Sanitation Others: DIRTY SIDEWALK. Hearing pending. | jz4z-kudi |

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-10-23 | closed (Closed) | 311 request to DSNY: Dirty Condition – Trash. | erm2-nwe9 |
| 2026-09-21 | closed (Closed) | 311 request to DSNY: Graffiti – Graffiti. | erm2-nwe9 |
| 2026-04-26 | closed (Closed) | 311 request to DSNY: Graffiti – Graffiti. | erm2-nwe9 |
| 2026-03-19 | closed (Closed) | 311 request to NYPD: Illegal Parking – Blocked Sidewalk. | erm2-nwe9 |
| 2026-03-18 | closed (Closed) | 311 request to NYPD: Blocked Driveway – No Access. | erm2-nwe9 |
| 2026-03-17 | closed (Closed) | 311 request to DSNY: Dirty Condition – Trash. | erm2-nwe9 |
| 2026-03-17 | closed (Closed) | 311 request to NYPD: Illegal Parking – Double Parked Blocking Traffic. | erm2-nwe9 |
| 2026-03-14 | closed (Closed) | 311 request to DOB: Building/Use – No Certificate Of Occupancy/Illegal/Contrary To CO. | erm2-nwe9 |
| 2026-02-24 | closed (Closed) | 311 request to DSNY: Snow or Ice – Sidewalk. | erm2-nwe9 |
| 2026-02-14 | closed (Closed) | 311 request to DSNY: Graffiti – Graffiti. | erm2-nwe9 |
| 2026-02-04 | closed (Closed) | 311 request to DSNY: Snow or Ice – Sidewalk. | erm2-nwe9 |
| 2025-12-06 | closed (Closed) | 311 request to NYPD: Blocked Driveway – No Access. | erm2-nwe9 |

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as GREAT EMPIRE 65 REALTY LLC. | 64uk-42ks |
| 2013-08-29 | recorded | Grantee (buyer) on the most recent deed (DEED, 2013-08-29). | 636b-3b5g |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/3057420057