# 819 Edgewater Road, Bronx, NY 10474

BBL 2027620300 · Block 2762 · Lot 300 · BIN 2006491  
Canonical page: https://nycpropertyfacts.com/ny/bronx/819-edgewater-road-2027620300  
Last updated: 2026-10-31 · Open-item counts as of 2026-10-31

Also recorded as: 825 Edgewater Rd

## Summary

819 Edgewater Road (Bronx, NY 10474; tax lot BBL 2027620300) is a factory or industrial building (building class F4: factory / industrial building (subtype F4)), built around 1925, on a 17,500 sq ft lot zoned M2-1. City tax records list the owner as 45401 L.P.; the most recent deed with a stated price is dated June 6, 2007 at $5,000,000 in a deed covering 5 lots (per ACRIS). The Department of Finance's final market value for tax year 2027 is $1,394,000. As of October 31, 2026, NYC Open Data shows four DOB jobs with a permit issued but no sign-off and 51 active DOB violations. There were two 311 requests in the past 12 months and no HPD complaints since 2019. (Source: NYC Open Data — DOB, HPD, OATH, DOF, DCP and ACRIS datasets — compiled by NYC Property Facts.)

How to cite: NYC Property Facts, “819 Edgewater Road, Bronx, NY 10474 (BBL 2027620300)”, data as of 2026-10-31, https://nycpropertyfacts.com/ny/bronx/819-edgewater-road-2027620300. Source: NYC Open Data.

## Open items

| Item | Count |
|---|---|
| Open DOB jobs (permit issued, not signed off) | 4 |
| Active DOB violations | 51 |
| Active ECB violations | 0 |
| Open HPD violations | 0 |
| OATH tickets with unpaid balance | 0 |

## Lot & building

- Owner of record: 45401 L.P.
- Building class: F4 – Factory / industrial building (subtype F4)
- Year built: 1925
- Floors: 2
- Units: 0 residential / 1 total
- Lot area: 17,500 sq ft · Building area: 10,700 sq ft
- Zoning: M2-1
- Source: PLUTO (Dept. of City Planning) (https://data.cityofnewyork.us/d/64uk-42ks), data as of 2026-11-02

## Tax assessment

- Tax year 2027 (final roll): market value $1,394,000, assessed value $627,300, tax class 4
- Source: DOF Property Valuation and Assessment Data (https://data.cityofnewyork.us/d/8y4t-faws)

## Sales & deeds (ACRIS)

Deeds recorded with the City Register. amount 0 usually means a non-market transfer. lots_in_deed > 1 means the price covers several lots.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-11-20 | recorded (DEED) | DEED dated 2025-11-20 from 10454 LLC to 45401 L.P., no price stated ($0) for a deed covering 5 lots. | bnx9-e6tj |
| 2022-01-15 | recorded (DEED) | DEED dated 2022-01-15 from EDGEWATER REALTY LLC to 10455 LLC; 10454 LLC, no price stated ($0) for a deed covering 5 lots. | bnx9-e6tj |
| 2007-06-06 | recorded (DEED) | DEED dated 2007-06-06 from DEXTER CHEMICAL LLC to EDGEWATER REALTY LLC, stated price $5,000,000 for a deed covering 5 lots. | bnx9-e6tj |
| 1998-06-02 | recorded (DEED) | DEED dated 1998-06-02 from DEXTER CHEMICAL CORPORATION/SUCC; 819 EDGEWATER ROAD CORP./MERGER to DEXTER CHEMICAL L.L.C., no price stated ($0). | bnx9-e6tj |

## Open DOB jobs and recent work permits

A DOB "job" is an application to do construction work. status "open" = a permit was issued but DOB has no record of final sign-off. Work permits are listed with type "work_permit" and their DOB permit status (they are not counted as open items).

| Date | Status | Description | Source |
|---|---|---|---|
| 2013-05-13 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 220289505 (A3 – Minor alteration (one type of work)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. PROPOSED LEGALIZATION OF ALL WORK DONE WITHOUT A PERMIT TO EXISTING BUILDING.FILED IN CONJUNCTION WITH APPLICATION #220246534. | ic3t-wcy2 |
| 2013-01-29 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 220246534 (A1 – Major alteration (changes use, egress or occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. PROPOSED ALTERATION TO EXISTING BUILDING TO CHANGE USE FROM CHEMICAL FACTORY (USE GROUP 18) TO ENCLOSED CONTRACTOR'S ESTABLISHMENT AND OFFICES (USE GROUP 17A) | ic3t-wcy2 |
| 2010-07-09 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 220071589 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. | ic3t-wcy2 |
| 1999-02-05 | open (PERMIT ISSUED - ENTIRE JOB/WORK) | BIS job 200563880 (A2 – Alteration with multiple work types (no change to use/occupancy)): PERMIT ISSUED - ENTIRE JOB/WORK — permit issued, no sign-off on record. INSTALL (1)NEW 4000 GALLON ABOVE GROUND FUEL OIL TANK WITH MASONRY DIKE AND LEGALLY ABANDON EXISTING BURIED FUEL OIL TANK.NO CHANGE IN USE GROUP,OR OCCUPANCY. | ic3t-wcy2 |
| 2025-07-09 | n/a (Signed-off) | DOB NOW work permit for job X01231604-I1: Sign — PROPOSE TO INSTALL CHANNEL LETTERS SIGNAGES ON ALUMINUM RACEWAY FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.. Issued 2025-07-09, expires 2025-12-19. | rbx6-tga4 |
| 2014-04-25 | n/a (ISSUED (initial)) | BIS work permit for job 220388131: Plumbing / Plumbing. Issued 2014-04-25, expires 2015-04-25. | ipu4-2q9a |
| 2013-10-08 | n/a (ISSUED (initial)) | BIS work permit for job 220339514: Equipment work / Other / general construction. Issued 2013-10-08, expires 2014-04-23. | ipu4-2q9a |
| 2013-07-17 | n/a (ISSUED (initial)) | BIS work permit for job 220246534: Plumbing / Plumbing. Issued 2013-07-17, expires 2014-07-17. | ipu4-2q9a |
| 2013-06-12 | n/a (ISSUED (initial)) | BIS work permit for job 220246534: Alteration. Issued 2013-06-12, expires 2014-04-23. | ipu4-2q9a |
| 2013-05-13 | n/a ((initial)) | BIS work permit for job 220289505: Alteration / Other / general construction. Issued 2013-05-13, expires 2014-05-13. | ipu4-2q9a |
| 2010-09-02 | n/a (ISSUED (initial)) | BIS work permit for job 220071589: Plumbing / Plumbing. Issued 2010-09-02, expires 2011-09-02. | ipu4-2q9a |
| 2009-05-07 | n/a (ISSUED (initial)) | BIS work permit for job 210084219: Equipment work / Other / general construction. Issued 2009-05-07, expires 2009-08-01. | ipu4-2q9a |
| 2008-07-30 | n/a (ISSUED (renewal)) | BIS work permit for job 210022580: Equipment work / Other / general construction. Issued 2008-07-30, expires 2009-06-06. | ipu4-2q9a |
| 2007-11-13 | n/a (ISSUED (initial)) | BIS work permit for job 210022580: Equipment work / Other / general construction. Issued 2007-11-13, expires 2008-06-06. | ipu4-2q9a |
| 1999-02-16 | n/a (ISSUED (initial)) | BIS work permit for job 200563880: Equipment work / Fuel storage. Issued 1999-02-16, expires 2000-02-16. | ipu4-2q9a |
| 1999-02-16 | n/a (ISSUED (initial)) | BIS work permit for job 200563880: Equipment work / Other / general construction. Issued 1999-02-16, expires 1999-05-01. | ipu4-2q9a |

## Open violations (DOB, ECB, HPD)

status "open" = DOB violation category is ACTIVE, ECB violation status is ACTIVE, or HPD violation status is Open.

| Date | Status | Description | Source |
|---|---|---|---|
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2025-11-14 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2024-09-23 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-30 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-06-20 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |
| 2023-04-25 | open (V-DOB VIOLATION - ACTIVE) | DOB violation (HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED): VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION. Active — not recorded as resolved or dismissed. | 3h2n-5cm9 |

Showing 40 of 51. Full list: https://nycpropertyfacts.com/api/v1/property/2027620300/violations

## OATH tickets with unpaid balance or pending

status "open" = balance due > $0 after a decision (cases awaiting a hearing are "pending"). default=true means the respondent did not appear.

| Date | Status | Description | Source |
|---|---|---|---|
| 2002-05-14 | pending (STAYED · DEFAULT) | OATH ticket from a city agency: charge not given. Hearing pending. Respondent defaulted (did not appear). | jz4z-kudi |
| 2002-05-14 | pending (STAYED · DEFAULT) | OATH ticket from a city agency: charge not given. Hearing pending. Respondent defaulted (did not appear). | jz4z-kudi |

## Complaints (HPD since 2019, 311 last 12 months)

Complaints are reports, not violations. status mirrors the published complaint / request status.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-10-29 | open (In Progress) | 311 request to DEP: Air Quality – Dust. | erm2-nwe9 |
| 2026-10-06 | open (In Progress) | 311 request to DCWP: Consumer Complaint – Scrap Metal Processor. | erm2-nwe9 |

## Owners & contacts

Owner of record comes from city tax records (PLUTO) and can lag behind recent sales.

| Date | Status | Description | Source |
|---|---|---|---|
| 2026-08-24 | current | City tax records (PLUTO) list the owner as 45401 L.P.. | 64uk-42ks |
| 2025-11-20 | recorded | Grantee (buyer) on the most recent deed (DEED, 2025-11-20). | 636b-3b5g |

---

Independent site. Data from NYC Open Data; not affiliated with the City of New York. Not a title search or official record; verify with the issuing agency. JSON: https://nycpropertyfacts.com/api/v1/property/2027620300